
-
Architects: SAV Architecture + Design
- Area: 417 m²
- Year: 2025


What if industrial leftovers weren't waste, but the start of architectural design? At Rieder's headquarters in Maishofen, Austria, over 1,300 cubic meters of timber, 180 ceiling elements, and hundreds of upcycled glassfiber-reinforced concrete fragments come together in a building shaped as much by reuse as by planning. The new production hall, designed by Kessler² Architecture, treats material leftovers as a design resource. Developed as part of a long-term investment in sustainable manufacturing, the timber-concrete hybrid building introduces a facade technique that inverts conventional architectural workflows: instead of designing first and producing components afterward, the building envelope is generated from the material remnants already available on site establishing a new language for industrial architecture.






Following the release of seven shortlisted proposals in 2025 through an online gallery, the Foundation for the Development of the Lands Adjacent to the Baptism Site has announced the winner of the international design competition for the Museum of Jesus' Baptism at Bethany, Jordan. Managed by Malcolm Reading Consultants, the six-month invited competition brought together architect-led multidisciplinary teams to design a museum and landscape project responding to the sacred character of Al-Maghtas, a UNESCO World Heritage Site. After finalist interviews conducted by an international Advisory Panel, the team led by Níall McLaughlin Architects (NMLA) was selected as the competition winner.


The Milano Cortina 2026 Winter Olympics officially opened on Friday, February 6, with a ceremony staged across four locations in northern Italy. The main opening event took place at San Siro Stadium, one of Milan's most significant modernist landmarks, and combined dance and performing arts, referencing Italian culture with performances by international artists, including pop star Mariah Carey. Although several competitions had already begun on February 4, the opening ceremony marked the start of a broader programme of sporting, social, and cultural events distributed across Milan and the three Alpine host areas: Cortina d'Ampezzo, Valtellina, and Val di Fiemme. The Games are scheduled to run until February 22, concluding with a closing ceremony at the Verona Arena, ahead of the Paralympic Games, which will take place from March 6 to 15. As a large-scale international event, the Olympics place significant demands on sports infrastructure, transportation networks, accommodation, and tourism capacity, offering early indications of the longer-term urban, architectural, and territorial impacts the Games may leave behind.
