1. ArchDaily
  2. In Progress

In Progress

In Progress: Roche Building 1 / Herzog & de Meuron

In Progress: Roche Building 1 / Herzog & de Meuron - Image 11 of 4
© F. Hoffmann-La Roche Ltd.

Earlier this month, Roche held a foundation stone-laying ceremony for their new office building that is currently being constructed in Basel, Switzerland. Designed by the Basel-based architecture practice of Herzog & de Meuron, the 178-meter-tall tapering structure will be formed by superimposed floor slabs that narrow as the high rise ascends. Its simple shape and predominantly white color scheme will anchor itself within the urban setting of Basel and become one of the few high rises scattered throughout the city’s skyline.

Continue after the break for more images and information.

In Progress: Roche Building 1 / Herzog & de Meuron - Image 6 of 4In Progress: Roche Building 1 / Herzog & de Meuron - Image 9 of 4In Progress: Roche Building 1 / Herzog & de Meuron - Image 8 of 4In Progress: Roche Building 1 / Herzog & de Meuron - Image 7 of 4In Progress: Roche Building 1 / Herzog & de Meuron - More Images+ 14

In Progress: MassArt Student Residence Hall / ADD Inc

In Progress: MassArt Student Residence Hall / ADD Inc - Image 10 of 4
© Paul Clemence

New York-based architectural photographer Paul Clemence has shared with us recent images and his thoughts on Massachusetts College of Art and Design’s new student residence hall that is being constructed in downtown Boston. The 21-story, $61 million building is planned for completion this year.

Boston is not particularly known as a destination for trendy, contemporary architecture; but some new buildings are beginning to change that perception. From Diller Scofidio Renfro’s Institute of Contemporary Art to Norman Foster’s new wing at The Museum of Fine Arts to the recently completed Renzo Piano addition to the beloved Gardner Museum, the city’s urbanscape is getting a much needed updating. And now, a soon to be finished bold new project by the firm ADD Inc is bringing a colorful twist to the mix. They are the designers behind the new MassArt Students Residence Hall.

Continue reading for more.

In Progress: China Steel Corporation Headquarters / KRIS YAO | ARTECH

In Progress: China Steel Corporation Headquarters / KRIS YAO | ARTECH - Image 16 of 4
© Jeffrey Cheng

Architects: Kris Yao | Artech Architects Location: Kaohsiung, Taiwan Clients: China Steel Corporation (CSC) Design Team: Willy Yu, Hua-Yi Chang, Nai-Wen Cheng, Jun-Ren Chou, Yen-Hsun Li Site Area: 11,037 sqm Lot Coverage Area: 2,590 sqm Total Floor Area: 81,054 Completion: Expected 2012 Photographs: Jeffrey Cheng

In Progress: China Steel Corporation Headquarters / KRIS YAO | ARTECH - Image 15 of 4In Progress: China Steel Corporation Headquarters / KRIS YAO | ARTECH - Image 14 of 4In Progress: China Steel Corporation Headquarters / KRIS YAO | ARTECH - Image 13 of 4In Progress: China Steel Corporation Headquarters / KRIS YAO | ARTECH - Image 12 of 4In Progress: China Steel Corporation Headquarters / KRIS YAO | ARTECH - More Images+ 14

In Progress: Barclays Center / SHoP

In Progress: Barclays Center / SHoP - Image 7 of 4
Photograph by Roger Edwards.

We have been keeping close watch on the progress of Barclays Center, SHoP’s 650,000+ stadium for Brooklyn at Atlantic Yards. The project has an interesting history as the client, Bruce Ratner, originally looked to Gehry to design an urban solution and iconic image for the 22 acre site, prior to teaming with Ellerbe Becket and SHoP. As we’ve reported earlier, SHoP’s response has developed to become a sweeping pre-fabricated volume, with a perforated latticework steel skin and a transparent ground level. Photographer Roger Edwards has shared some recent photos with us of the construction process as the building is quickly beginning to take shape.

Check out more photos after the break.

In Progress: Bosco Verticale / Boeri Studio

In Progress: Bosco Verticale / Boeri Studio - Image 12 of 4
Courtesy of Boeri Studio

Bosco Verticale, by Boeri Studio (now recognized as Barreca & La Varra and Stefano Boeri Architetti), is a high-density tower block that experiments with the integration of a lush landscape within the facade of the architecture. The Vertical Forest, currently in construction in Milan, Italy, deal with the concept of regenerating the lost forests on the ground within the inhabitable space of buildings. The towers are 80 metres and 112 metres tall. Together they will have the capacity to hold 480 big and medium sized trees, 250 small size trees, 11,000 groundcover plants and 5,000 shrubs – the equivalent of a hectare of forest. For more on this project, follow us after the break.

Architects: Boeri Studio (Stefano Boeri, Gianandrea Barreca, Giovanni La Varra) Location: Milan, Italy Design Phase: 2006 – 2008 Construction Phase: 2008 – 2013

In Progress: Bosco Verticale / Boeri Studio - Image 11 of 4In Progress: Bosco Verticale / Boeri Studio - Image 10 of 4In Progress: Bosco Verticale / Boeri Studio - Image 9 of 4In Progress: Bosco Verticale / Boeri Studio - Image 7 of 4In Progress: Bosco Verticale / Boeri Studio - More Images+ 8

In Progress: Mediterraneo House / Manuel Ocaña

 In Progress: Mediterraneo House / Manuel Ocaña - Image 20 of 4
© Manuel Ocaña

Architect: Manuel Ocaña del Valle Location: Benalúa Railway Station, Alicante, Spain Developer: Casa Mediterráneo Collaborators: Miguel Molins Jiménez, Karolina Kurzak, Adriana Cepeda, Paloma Montoro, María Ortiz-Muyo, BeDV Arquitectos Project Management: INECO Project Director: Marisa Guillamot Bernardo Built surface: 3,500 sqm Budget: 5,900,000 euros Photographs: Manuel Ocaña

 In Progress: Mediterraneo House / Manuel Ocaña - Image 21 of 4 In Progress: Mediterraneo House / Manuel Ocaña - Image 11 of 4 In Progress: Mediterraneo House / Manuel Ocaña - Image 7 of 4 In Progress: Mediterraneo House / Manuel Ocaña - Featured Image In Progress: Mediterraneo House / Manuel Ocaña - More Images+ 17

In Progress: Arena Castelão / VIGLIECCA&ASSOC

In Progress: Arena Castelão / VIGLIECCA&ASSOC - Image 25 of 4
© Azul Serra

Architects: VIGLIECCA&ASSOC Location: Fortaleza, Ceará, Brazil Date: 2008 – under construction Client: State of Ceará Government / Special Department of the State of Ceará for 2014 Cup Total Intervention Area: 215.000 sqm Design Team: Hector Vigliecca, Luciene Quel, Ronald Werner, Neli Shimizu, Caroline Bertoldi, Bianca Riotto, Fernanda Trotti, Hernani Paiva, Kelly Bozzato, Luiz Marino, Mayara Christ, Pedro Ichimaru, Rafael Alcantara, Paulo Serra, Luci Maie, Renata Haring Construction: Galvão + Andrade Mendonça Landscaping: Rodolfo Geiser Paisagismo e Meio Ambiente Photographs: Azul Serra

In Progress: Arena Castelão / VIGLIECCA&ASSOC - Image 21 of 4In Progress: Arena Castelão / VIGLIECCA&ASSOC - Image 20 of 4In Progress: Arena Castelão / VIGLIECCA&ASSOC - Image 19 of 4In Progress: Arena Castelão / VIGLIECCA&ASSOC - Image 18 of 4In Progress: Arena Castelão / VIGLIECCA&ASSOC - More Images+ 22

Updated Plans released for Foster + Partner’s new Apple Campus in Cupertino

Updated Plans released for Foster + Partner’s new Apple Campus in Cupertino - Image 24 of 4
© Foster + Partners, ARUP, Kier + Wright, Apple

Apple has released updated plans revealing an ambitions solar installation for their proposed campus in Cupertino. Announced back in June, the campus will include an office, research and development building, research facilities, corporate auditorium, fitness center, a central plant and associated parking. Foster + Partners will collaborate with ARUP North America and local civil engineering firm Kier & Wright for the completion of the project.

Continue reading for more details.

Updated Plans released for Foster + Partner’s new Apple Campus in Cupertino - Image 25 of 4Updated Plans released for Foster + Partner’s new Apple Campus in Cupertino - Image 3 of 4Updated Plans released for Foster + Partner’s new Apple Campus in Cupertino - Image 17 of 4Updated Plans released for Foster + Partner’s new Apple Campus in Cupertino - Image 27 of 4Updated Plans released for Foster + Partner’s new Apple Campus in Cupertino - More Images+ 23

In Progress: Shenzhen Clubhouse / Richard Meier & Partners Architects

In Progress: Shenzhen Clubhouse / Richard Meier & Partners Architects - Image 8 of 4
© Richard Meier & Partners Architects LLP

Construction of Richard Meier’s Shenzhen Clubhouse is nearing completion. Unique geometry fully clad in white metal panels play with overlays of solid and void, unmistakably consistent with the Richard Meier signature style. Being located on an island in the center of OCT Bay, the facility is surrounded by large bodies of water and lush gardens. The Shenzhen Clubhouse is scheduled to be completed early next year.

Continue reading for the architects project description, photographs, renderings and drawings.

Architects: Richard Meier & Partners Architects LLP Location: Shenzhen, China Project Area: 11,000 sqm Completion: 2012 Photographs: Richard Meier & Partners Architects LLP

In Progress: Shenzhen Clubhouse / Richard Meier & Partners Architects - Featured ImageIn Progress: Shenzhen Clubhouse / Richard Meier & Partners Architects - Image 17 of 4In Progress: Shenzhen Clubhouse / Richard Meier & Partners Architects - Image 15 of 4In Progress: Shenzhen Clubhouse / Richard Meier & Partners Architects - Image 13 of 4In Progress: Shenzhen Clubhouse / Richard Meier & Partners Architects - More Images+ 14

In Progress: Marlins Ballpark / Populous

In Progress: Marlins Ballpark / Populous - Image 2 of 4
© Emilio Collavino

Architects: Populous Location: Miami, Florida, USA Photographs: Emilio Collavino

In Progress: Marlins Ballpark / Populous - Image 1 of 4In Progress: Marlins Ballpark / Populous - Image 3 of 4In Progress: Marlins Ballpark / Populous - Image 16 of 4In Progress: Marlins Ballpark / Populous - Image 4 of 4In Progress: Marlins Ballpark / Populous - More Images+ 12

In Progress: Messe Basel / Herzog & de Meuron

In Progress: Messe Basel / Herzog & de Meuron - Image 9 of 4
© MCH Swiss Exhibition (Basel) Ltd.

The modernization of the Messe Basel is making progress. Developed by Basel architects Herzog & de Meuron on behalf of the MCH Group, the project aims renew the existing exhibition space and become a popular destination for pedestrians and foreign visitors. The new multifunctional exhibition building is scheduled for completion in 2013.

Architects: Herzog & de Meuron Basel Ltd., Basel Location: Basel, Switzerland Client: MCH Messe Switzerland AG, Basel, Switzerland Project Area: 141,000 m2 Construction Period: 2010 – 2013 Photographs: Courtesy of MCH Swiss Exhibition (Basel) Ltd.

Continue reading for more images, renderings and information.

In Progress: Messe Basel / Herzog & de Meuron - Featured ImageIn Progress: Messe Basel / Herzog & de Meuron - Image 13 of 4In Progress: Messe Basel / Herzog & de Meuron - Image 15 of 4In Progress: Messe Basel / Herzog & de Meuron - Image 1 of 4In Progress: Messe Basel / Herzog & de Meuron - More Images+ 12

9/11 Memorial and Museum / Handel Architects with Peter Walker, Davis Brody Bond

9/11 Memorial and Museum / Handel Architects with Peter Walker, Davis Brody Bond - Image 2 of 4
VIsualization by Squared Design Lab - http://www.911memorial.org/

Ten years since the 9/11 attacks on the World Trade Center in New York, the National September 11 Memorial was dedicated in a private ceremony with the victims’ families. It was officially opened to the public as of today, September 12th. The opening of the 9/11 Memorial is a first step towards the closing of a long chapter of construction at the World Trade Center site.

In Progress: One World Trade Center / SOM

In Progress: One World Trade Center / SOM - Image 4 of 4
© Paul Clemence

Architecture photographer Paul Clemence shared with us a recent photo set of the current status of the One World Trade Center building by SOM.

I was downtown today, checking  out the commotion by Ground Zero and snapped these images of the Freedom Tower. Is for sure going up and we can already glance at its connection to neighborhood buildings, its presence on the skyline and some interesting architectural nuances.

- Paul Clemence

More photos after the break.

In Progress: Kamppi Chapel of Silence / K2S Architects

In Progress: Kamppi Chapel of Silence / K2S Architects - Image 6 of 4
View from Lasipalatsi

Architects: K2S Architects Ltd Location: Helsinki, Finland Client: Helsinki Parish Union and the City of Helsinki Structural engineering: Insinööritoimisto Vahanen Oy Matti Kivinen, Ulla Harju Project Year: 2012 Project Area: 300 sqm Photographs: Courtesy of K2S Architects

In Progress: Kamppi Chapel of Silence / K2S Architects - Image 7 of 4In Progress: Kamppi Chapel of Silence / K2S Architects - Image 12 of 4In Progress: Kamppi Chapel of Silence / K2S Architects - Featured ImageIn Progress: Kamppi Chapel of Silence / K2S Architects - Image 8 of 4In Progress: Kamppi Chapel of Silence / K2S Architects - More Images+ 8

In Progress: ABC Dbayeh Department Store and Cinema Façade / nARCHITECTS

In Progress: ABC Dbayeh Department Store and Cinema Façade / nARCHITECTS - Image 5 of 4
Courtesy of nARCHITECTS

Architects: nARCHITECTS Location: Beirut, Lebanon Design Team: Eric Bunge, Mimi Hoang (Principals); Tiago Barros, Stephen Hagmann, Hubert Pelletier (Project Architects); Seung Teak Lee, Julia Chapman, Christopher Grabow (Design Team); Competition Phase: Alice Wong (Project Designer), Dominique Gonfard, Adam Vana Architect of Record: ABC Technical Team: Lamia Jallad, Bascir Muhanna, Johnny Salman Client: ABC S.A.L. Structural Engineer: BRM Lighting Designer: DEBBAS Landscape: ZMK Project Year: 2011 Project Area: 50,000 sqm Photographs: Courtesy of nARCHITECTS

In Progress: ABC Dbayeh Department Store and Cinema Façade / nARCHITECTS - Image 6 of 4In Progress: ABC Dbayeh Department Store and Cinema Façade / nARCHITECTS - Image 7 of 4In Progress: ABC Dbayeh Department Store and Cinema Façade / nARCHITECTS - Image 3 of 4In Progress: ABC Dbayeh Department Store and Cinema Façade / nARCHITECTS - Image 4 of 4In Progress: ABC Dbayeh Department Store and Cinema Façade / nARCHITECTS - More Images+ 6

In Progress: Bicentennial Civic Center / Lucio Morini + GGMPU

In Progress: Bicentennial Civic Center / Lucio Morini + GGMPU - Image 21 of 4
Courtesy of Lucio Morini Studio

Architects: Lucio Morini + GGMPU Location: Córdoba, Argentina Client: Government of the Province Cordoba Collaborators: Julia Garayoa, Adrián Castagno, Verónica Gordillo, Diego Andres Gómez, Mariana Pelliza, Guadalupe Daher, Cecilia Villareal, Luciana Antonucci, Agustín Elies Project Year: 2011 Project Area: 21,380 sqm Photographs: Courtesy of Lucio Morini Studio

In Progress: Bicentennial Civic Center / Lucio Morini + GGMPU - Image 20 of 4In Progress: Bicentennial Civic Center / Lucio Morini + GGMPU - Image 19 of 4In Progress: Bicentennial Civic Center / Lucio Morini + GGMPU - Image 18 of 4In Progress: Bicentennial Civic Center / Lucio Morini + GGMPU - Image 17 of 4In Progress: Bicentennial Civic Center / Lucio Morini + GGMPU - More Images+ 39

In Progress: Four Freedoms Park / Louis Kahn

In Progress: Four Freedoms Park / Louis Kahn - Image 13 of 4
Via Bloomberg

Last September, we shared the news of Louis Kahn’s memorial park for the southernmost tip of Roosevelt Island. Kahn had designed the park in the 70s, but after his sudden death, the plan was forgotten until 1992 when the MoMA featured the scheme in an exhibition. Upon learning of Kahn’s thoughtful and architecturally compelling ideas to commemorate FDR and his Four Freedoms speech, the public quickly advocated its completion. As we reported earlier, at the end of Kahn’s axial tree-lined triangular “Garden”, a 72 sqf “Room” will contain excerpts from the text of President Roosevelt’s Four Freedoms speech. This room, contained by 12 foot high granite columns, is meant for contemplation and remembrance as Kahn’s stoic material palette, clear formal attitude, and forced perspective of the skyline will create, what we imagine will be, a quiet and peaceful atmosphere. With Kahn’s simple gestures, the memorial will preserve a time in American history where FDR’s leadership inspired hope to endure the Great Depression and the second World War. We’re excited for the memorial to be completed and we’ll keep you up to date with its progress.

A great sample of construction photos and renderings after the break.

In Progress: Gateway Center Station / EDGE Studio, Pfaffmann & Associates

In Progress: Gateway Center Station / EDGE Studio, Pfaffmann & Associates - Image 8 of 4
© Carl Bergamini, Pfaffmann & Associates

Architect: EDGE Studio, Pfaffmann & Associates Location: Pittsburgh, Pennsylvania EDGE Studio Design Team: Gary Carlough AIA, Jonathan Golli, Matt Fineout AIA, Stephen Mrdjenovich Pfaffmann & Associates Design Team: Rob Pfaffmann AIA, Carl Bergamini RA, Erik Hokanson Completion Date: 2011 Photography: Carl Bergamini, Pfaffmann & Associates

In Progress: Gateway Center Station / EDGE Studio, Pfaffmann & Associates - Image 10 of 4In Progress: Gateway Center Station / EDGE Studio, Pfaffmann & Associates - Image 12 of 4In Progress: Gateway Center Station / EDGE Studio, Pfaffmann & Associates - Image 9 of 4In Progress: Gateway Center Station / EDGE Studio, Pfaffmann & Associates - Image 15 of 4In Progress: Gateway Center Station / EDGE Studio, Pfaffmann & Associates - More Images+ 11

In Progress: Iceberg / CEBRA + JDS + SeARCH + Louis Paillard

We’ve been covering CEBRA + JDS + SeARCH + Louis Paillard’s geometric harbor project for Arhus, Denmark. The huge project, which measures over 21,000 sqm, will include mixed dwellings types and commercial space. CEBRA has shared a few short video clips with us, highlighting the progress of the project. This featured clip is shot from the bridge connecting the future harbor promenade across the nearby canal. The grey concrete wall shown is the beginning of the southern facade (the actual floor is on top of the wall) and behind the wall is where the parking is situated.

Another video, as well as a few construction photos, after the break.

Update: Shenzhen Stock Exchange by OMA

Update: Shenzhen Stock Exchange by OMA - Image 1 of 4
© OMA

The NASDAQ equivalent Shenzhen Stock Exchange by OMA, continues to progress forward nearing completion. The latest photographs of the new building, which poses a strong representation of capitalism in China, highlight the robust exoskeletal grid and the and complexity of construction.

“For millennia, the solid building stands on a solid base; it is an image that has survived modernity. Typically, the base anchors a structure and connects it emphatically to the ground. The essence of the stock market is speculation: it is based on capital, not gravity. In the case of Shenzhen’s almost virtual stock market, the role of symbolism exceeds that of the program – it is a building that has to represent the stock market, more than physically accommodate it. It is not a trading arena with offices, but an office with virtual organs that suggest and illustrate the process of the market.”

- OMA

More construction photographs of the Shenzhen Stock Exchange after the break.

Update: Shenzhen Stock Exchange by OMA - Image 5 of 4Update: Shenzhen Stock Exchange by OMA - Featured ImageUpdate: Shenzhen Stock Exchange by OMA - Image 2 of 4Update: Shenzhen Stock Exchange by OMA - Image 7 of 4Update: Shenzhen Stock Exchange by OMA - More Images+ 3

Isabella Stewart Gardner Expansion / Renzo Piano Building Workshop

Opening in 2012, the $118 million steel, glass, and copper-clad expansion to Boston’s Isabella Stewart Gardner Museum by Renzo Piano Building Workshop will more than double the size of the current facility. Included in the project are a new entrance, music hall, gallery space, and other amenities for an institution that has remained largely unaltered since opening in 1903.

In Progress: Allianz Headquarters / Wiel Arets Architects

In Progress: Allianz Headquarters / Wiel Arets Architects - Image 3 of 4
© Jan Bitter

The Allianz Headquarters is an office complex linked and interlocked by a series of bridges and voids that aims to progress the 21st century work environment by becoming a second home to employees.

In Progress: Allianz Headquarters / Wiel Arets Architects - Image 4 of 4In Progress: Allianz Headquarters / Wiel Arets Architects - Image 8 of 4In Progress: Allianz Headquarters / Wiel Arets Architects - Image 10 of 4In Progress: Allianz Headquarters / Wiel Arets Architects - Image 7 of 4In Progress: Allianz Headquarters / Wiel Arets Architects - More Images+ 6

Architect: Wiel Arets Architects Location: Zürich, Switzerland Photographs: Jan Bitter

In Progress: The Capital / James Law Cybertecture International

In Progress: The Capital / James Law Cybertecture International - Image 21 of 4
© Courtesy of James Law Cybertecture International

Architects: James Law Cybertecture International Location: Mumbai, India Project Area: 66,347 sqm Photographs: Courtesy of James Law Cybertecture International

Cybertecture is the ultimate expression of innovative art married with functional needs in consideration of the environment and humanity. The new commercial complex located in Mumbai, India ”The Capital” deliberately reveals her calmness, gracefulness and elegance. It is an extremely challenging work to develop a revolutionary design concept for an office with AAA- grading and achieving over 80% efficiency simultaneously. It integrated the sustainable concept, form and functionality that inspire the office building design and urban context in India like never before.

Adobe for Women / blaanc borderless architecture and CaeiroCapurso

Adobe for Women / blaanc borderless architecture and CaeiroCapurso - Image 11 of 4
Courtesy of blaanc borderless architecture

Two young architecture firms have joined forces to create the non-profit association Adobe for Women. The goal of the association it to both recover and teach vernacular construction skills while simultaneously providing aide to women in need.

Inspired by the work of Mexican architect Juan José Santibañez, who twenty years ago helped twenty women in difficult living conditions to build their homes, two decades later blaanc borderless architecture and CaeiroCapurso have planned to construct twenty sustainable houses in the indigenous village of San Juan Mixtepec, in the southern Mexican state of Oaxaca.

The construction of the first house began in March of this year, enthusiastically lifting the women’s hopes for this project. With their commitment and determination they have produced more than 40.000 adobe bricks using earth from the surrounding areas. The houses are energy efficient and built with local materials such as adobe and bamboo. Each house costs only 3 830,84€ (the price of half a square meter in Paris or Amsterdam or a square meter in the Baltic capitals). For these twenty women with limited financial resources, having a home represents the dream of a lifetime.

Adobe for Women / blaanc borderless architecture and CaeiroCapurso - Image 10 of 4Adobe for Women / blaanc borderless architecture and CaeiroCapurso - Image 9 of 4Adobe for Women / blaanc borderless architecture and CaeiroCapurso - Image 8 of 4Adobe for Women / blaanc borderless architecture and CaeiroCapurso - Image 7 of 4Adobe for Women / blaanc borderless architecture and CaeiroCapurso - More Images+ 8

You've started following your first account!

Did you know?

You'll now receive updates based on what you follow! Personalize your stream and start following your favorite authors, offices and users.