On the twelfth anniversary of September 11th, we would like to share with you this incredible time-lapse capturing the progress of the One World Trade Center between 2004 and 2013. The 1,776 foot tall skyscraper, which is expected to be the tallest in Western Hemisphere, topped out earlier this year and is slated for completion in 2014.
In Progress: The Latest Architecture and News
Time-Lapse: One World Trade Center
Time-Lapse: One World Trade Center
On the twelfth anniversary of September 11th, we would like to share with you this incredible time-lapse capturing the progress of the One World Trade Center between October 2004 and September 2013. The 1,776 foot tall skyscraper, which is expected to be the tallest in Western Hemisphere, topped out earlier this year and is slated for completion in 2014.
Gensler Tops Out on World's Second Tallest Skyscraper: Shanghai Tower
On schedule to be China’s tallest and the world’s second tallest skyscraper, the Gensler -designed Shanghai Tower has topped out at 632 meters (2,074 feet). Upon completion in 2014, the spiraling megastructure will complete a trio of towers - including the adjacent Jin Mao Tower and Shanghai World Financial Center - to become the centerpiece of the city’s Lujiazui commercial district - one of Asia’s leading financial centers which developed from farmland in just over 20 years.
Defined by series of distinctive sky gardens, the state-of-the-art tower will house Class-A office and retail space, along with a luxury hotel and cultural venues.
Continue reading to learn how the Shanghai Tower’s structure saved millions and why it will achieve LEED Gold.
Infinity Tower / SOM
Architects
Civil, Electrical, Mechanical, Structural and Plumbing Engineering
SOMSite Area
3,026.50 m2Project Area
111,484 m2Building Height
307m (73 stories)Project Year
2013Photographs
Courtesy of SOMArchitects
Nosara Recycling Plant / sLAB
A small group of students and architect Tobias Holler of sLAB Costa Rica at the New York Institute of Technology, have teamed up to design and build a communal recycling center for Nosara, Costa Rica – a city that is facing grave problems with sanitation and illegal dumping of garbage on beaches and in wildlife areas. Construction started last summer after a Kickstarter campaign that raised $15,000 helped provide expenses and costs associated with housing the students that assisted with the construction. A relaunch of the Kickstarter campaign will provide the project with additional funds to bring the students back to accelerate the pace of construction. The funds also support the documentary by Ayana de Vos, whose film follows the progress of the project and features waste management and sustainability in Costa Rica.
Join us after the break for more.
The motivation behind building a Communal Recycling Center is based in the severe problems that Nosara specifically, and Costa Rica in general, has in municipal waste management. Without appropriate infrastructure and policies, over 1400 tons of waste is deposited into unregulated dumps daily. A lot of the garbage makes its way into rivers and forests, pollutes ground water, threatens the health of local communities and destroys wildlife.
In Progress: Truman Plaza / Wiel Arets Architects
Located in Berlin Zehlendorf, the Truman Plaza parallels the adjacent Clayallee and is part of a larger master plan that balances its historical urban context with its integration of a delicate onsite forest. Designed by Wiel Arets Architects, the project, which is currently in progress, includes offices, retail, health and sports facilities, which together form an urban setting situated around a central plaza within this leafy borough on the edge of Berlin. More images and architects’ description after the break.
In Progress: Sambade House / Spaceworkers
Architects: Spaceworkers Location: Penafiel, Porto, Portugal Architects In Charge: Henrique Marques, Rui Dinis Collaborators: Sérgio Rocha, Rui Miguel, Rui Rodrigues Project Year: 2012 Photographs: João Morgado Fotografia de Arquitectura
Taking the Long Road
In an article published by the New York Times, Philip Nobel laments the time taken to construct architecture. As architects, we have the passion to shape space and craft environments. For most, that translates into physically constructing such visions, but the path from drawing board (or computer screen) to realization is often times a long and arduous path.
In the past few years, such difficult financial times have challenged architects to fight for their buildings; namely, asking the designer to find ways to make the buildings work – whether with a changed material palette, smaller footprint, or shortened height. Yet, apart from finances, we’ve also reported dozens of projects which narrowly clear other obstacles, such as attaining community consent. And, of course, we have seen scores of great awarded competition proposals that do not incur the same luck, and slowly dwindle to non-existence.
One of our favorite parts of ArchDaily is our InProgress section, where we keep track of the progression of the original architectural vision through actuality. After the break, we share a few projects that haven’t had the most direct route through completion. Let us know in the comments below your thoughts on which project you’ve been waiting to see complete.
In Progress: MUSE Museum of Science / Renzo Piano
Architects: Renzo Piano Building Workshop Location: Trento, Italy Architect: Renzo Piano Project Year: 2012 Photographs: Courtesy of RPBW, RPBW – Stefano Goldberg, RPBW – Paolo Pelanda, Colombo Costruzioni – Alessandro Gadutti, RPBW – Cristiano Zaccaria
In Progress: Faculty of Law and Political Scies of Turin / Foster and Partners
Architects: Foster and Partners Location: Turin, Italy Design Group: MAIRE Engineering (agent), Foster and Partners, Ltd. ICIS, Giugiaro, Arch CAMERANA Benedict, Studio Ass Mellano, Buonomo Vigil Studio, Studio Ass CO.PA.CO, Prof. G. Garzino, Studio A. Lazzerini, M. Arch Luciani, Prof. Ing Ossola, POLIEDRA S.P.A. and TEKSYSTEM New building gross area: 36,232 sqm. Photographs: Courtesy of comunicarch
In Progress: New Parliament of Georgia / CMD Ingenieros
Architects: CMD Ingenieros Location: Kutaisi, Georgia Year of Construction: 2011-2012 Design Team: Alberto Domingo Cabo – PhD in Structural Engineering , Carlos Lázaro Fernández – PhD in Structural Engineering, Juliane Petri – Civil Engineer. Master’s Degree in Land Use Planning, Francisco Palacios Climent – Civil Engineer Client: Kutaisi City Hall Surface: 45,000 sqm Budget: 82,000,000 € Photographs: Courtesy of CMD Ingenieros
In Progress: Roche Building 1 / Herzog & de Meuron
Earlier this month, Roche held a foundation stone-laying ceremony for their new office building that is currently being constructed in Basel, Switzerland. Designed by the Basel-based architecture practice of Herzog & de Meuron, the 178-meter-tall tapering structure will be formed by superimposed floor slabs that narrow as the high rise ascends. Its simple shape and predominantly white color scheme will anchor itself within the urban setting of Basel and become one of the few high rises scattered throughout the city’s skyline.
Continue after the break for more images and information.
In Progress: MassArt Student Residence Hall / ADD Inc
New York-based architectural photographer Paul Clemence has shared with us recent images and his thoughts on Massachusetts College of Art and Design’s new student residence hall that is being constructed in downtown Boston. The 21-story, $61 million building is planned for completion this year.
Boston is not particularly known as a destination for trendy, contemporary architecture; but some new buildings are beginning to change that perception. From Diller Scofidio Renfro’s Institute of Contemporary Art to Norman Foster’s new wing at The Museum of Fine Arts to the recently completed Renzo Piano addition to the beloved Gardner Museum, the city’s urbanscape is getting a much needed updating. And now, a soon to be finished bold new project by the firm ADD Inc is bringing a colorful twist to the mix. They are the designers behind the new MassArt Students Residence Hall.
Continue reading for more.
In Progress: China Steel Corporation Headquarters / KRIS YAO | ARTECH
Architects: Kris Yao | Artech Architects Location: Kaohsiung, Taiwan Clients: China Steel Corporation (CSC) Design Team: Willy Yu, Hua-Yi Chang, Nai-Wen Cheng, Jun-Ren Chou, Yen-Hsun Li Site Area: 11,037 sqm Lot Coverage Area: 2,590 sqm Total Floor Area: 81,054 Completion: Expected 2012 Photographs: Jeffrey Cheng
In Progress: Barclays Center / SHoP
We have been keeping close watch on the progress of Barclays Center, SHoP’s 650,000+ stadium for Brooklyn at Atlantic Yards. The project has an interesting history as the client, Bruce Ratner, originally looked to Gehry to design an urban solution and iconic image for the 22 acre site, prior to teaming with Ellerbe Becket and SHoP. As we’ve reported earlier, SHoP’s response has developed to become a sweeping pre-fabricated volume, with a perforated latticework steel skin and a transparent ground level. Photographer Roger Edwards has shared some recent photos with us of the construction process as the building is quickly beginning to take shape.
Check out more photos after the break.
In Progress: Bosco Verticale / Boeri Studio
Bosco Verticale, by Boeri Studio (now recognized as Barreca & La Varra and Stefano Boeri Architetti), is a high-density tower block that experiments with the integration of a lush landscape within the facade of the architecture. The Vertical Forest, currently in construction in Milan, Italy, deal with the concept of regenerating the lost forests on the ground within the inhabitable space of buildings. The towers are 80 metres and 112 metres tall. Together they will have the capacity to hold 480 big and medium sized trees, 250 small size trees, 11,000 groundcover plants and 5,000 shrubs – the equivalent of a hectare of forest. For more on this project, follow us after the break.
Architects: Boeri Studio (Stefano Boeri, Gianandrea Barreca, Giovanni La Varra) Location: Milan, Italy Design Phase: 2006 – 2008 Construction Phase: 2008 – 2013
In Progress: Mediterraneo House / Manuel Ocaña
Architect: Manuel Ocaña del Valle Location: Benalúa Railway Station, Alicante, Spain Developer: Casa Mediterráneo Collaborators: Miguel Molins Jiménez, Karolina Kurzak, Adriana Cepeda, Paloma Montoro, María Ortiz-Muyo, BeDV Arquitectos Project Management: INECO Project Director: Marisa Guillamot Bernardo Built surface: 3,500 sqm Budget: 5,900,000 euros Photographs: Manuel Ocaña