Chinese company WinSun Decoration Design Engineering has constructed a set of ten single story, 3D-printed homes which it produced in under 24 hours. The homes, printed in prefabricated panels which fit together on site, were created using WinSun's custom-built 3D printer which measures 10 meters by 6.6 meters, and took the company twelve years to develop.
Formed with a cement-based mixture containing construction waste and glass fiber, each of the houses cost just $5,000 to build. Read on after the break for more on the development.
In an age when 1:1 3D printed buildings are becoming ever more commonplace from the Netherlands to China, it's important to pause and assess the existing built fabric of our cities, towns and villages. If we want to maintain and preserve them whilst protecting the inherent craft imbued in their construction, the importance of nurturing and promoting these skills should be recognised.
In the UK, the Heritage Skills Hub(HSH) push to see "traditional building skills, conservation, restoration and responsible retrofit" included within all mainstream built environment courses. In a recent conversation with Cathie Clarke, CEO of the HSH, we discussed the obstacles faced by an organisation dedicated to conserving and teaching skills like stonemasonry, roof thatching, glass making, traditional brick construction to a new generation.
UPDATE: This post originally stated that Villa Asserbo was 3D Printed, when in fact its pieces were printed using rapid prototyping technology (a subtractive, rather than additive process).
But today we heard a story about an alternative to 3D Printing‘s capabilities in the here and now - and its implications are pretty exciting.
In a small town outside of Copenhagen, Danish architects Eentileen joined forces with London-based digital fabrication and architecture specialists, Facit Homes, to create Villa Asserbo: a 1,250 square foot, sustainable home made from Nordic plywood fabricated via CNC miller and easily “snapped” together.
No heavy machinery, no cranes, no large labor force. Just a couple of guys, a few easily printed pieces, and six weeks.
Get more details about this sustainable, printed House, after the break…