the world's most visited architecture website
i

Sign up now and start saving and organizing your favorite architecture projects and photos

Sign up now to save and organize your favorite architecture projects

i

Find the most inspiring products for your projects in our Product Catalog.

Find the most inspiring products in our Product Catalog.

i

Get the ArchDaily Chrome Extension and be inspired with every new tab. Install here »

i

All over the world, architects are finding cool ways to re-use run-down old buildings. Click here to see the best in Refurbishment Architecture.

Want to see the coolest refurbishment projects? Click here.

i

Immerse yourself in inspiring buildings with our selection of 360 videos. Click here.

See our immersive, inspiring 360 videos. Click here.

All
Projects
Products
Events
Competitions
Navigate articles using your keyboard
  1. ArchDaily
  2. News
  3. Work On Walkie Talkie Fix Will Start This Month

Work On Walkie Talkie Fix Will Start This Month

Work On Walkie Talkie Fix Will Start This Month
Work On Walkie Talkie Fix Will Start This Month, © Flickr CC User pembridge2
© Flickr CC User pembridge2

Work to alter Rafael Viñoly Architects' 20 Fenchurch Street - dubbed the Walkie Talkie due to its unusual shape and then the "Walkie Scorchie" after it created a heat-focusing ray strong enough to melt cars last summer - is due to start later this month, after planning permission for the additions was granted in April. The alterations, also designed by Rafael Viñoly Architects, will see horizontal aluminium louvres added to the glass facade between the 3rd and the 34th floor to ensure that the reflective "death ray" effect is not repeated.

More on the building after the break

News of the effect proved instantly popular when it broke in September 2013, with people flocking to experience the hot-spot for themselves. Some even fried eggs in the glare, and one reading by the BBC measured surface temperatures of over 90°C (194°F).

The developer Land Securities says that the alterations required have not added to the building's cost, and despite the widespread ridicule, the building remains remains one of their most financially successful ventures. A statement from the company's 2014 annual results said that "a solar glare issue drew attention to the building for the wrong reasons but did nothing to deter lettings with 200,000 sq ft taken up in the months after the problem materialised." The building is said to be "all but completed" and has already let 87% of its office space.

About this author
Rory Stott
Author
Cite: Rory Stott. "Work On Walkie Talkie Fix Will Start This Month" 16 May 2014. ArchDaily. Accessed . <https://www.archdaily.com/507359/work-on-walkie-talkie-fix-will-start-this-month/> ISSN 0719-8884