![Silo Erlenmatt Renovation / Harry Gugger Studio - Interior Photography, Stairs, Handrail](https://images.adsttc.com/media/images/5ee8/3084/b357/6520/0900/0213/newsletter/LS_MG_1866_edited.jpg?1592275027)
-
Architects: Harry Gugger Studio
- Area: 2690 m²
- Year: 2020
-
Photographs:Lukas Schwabenbauer, Christian Kahl, Marc Gilgen, Leon Faust
-
Manufacturers: Adobe, Feller AG, Fixit, Glutz, McNeel, Nemetschek, Thymos, Ytong, Zehnder Group Schweiz
![Silo Erlenmatt Renovation / Harry Gugger Studio - Exterior Photography, Facade](https://images.adsttc.com/media/images/5ee8/2bf7/b357/6547/3e00/014b/newsletter/LS_IMG_0949_edited.jpg?1592273876)
Text description provided by the architects. On the Erlenmatt Ost site in the north of Kleinbasel a new urban quarter is developing. At its heart sits an abandoned silo, built in 1912 for the Basler Grain and Cacao Beans Dry Storage Company which is now converted into a multi-faceted venue for the wider local community. Based on the ideas of Stiftung Habitat Foundation and Talent Verein, a socio-cultural offer of different uses is to be created, which is accessible and can be experienced by everyone. This includes ateliers and studios as an affordable space for cultural workers, service providers and young businessmen, as well as a hostel and a restaurant at the heart of the project. The overall aim is to create and promote diversity.
![Silo Erlenmatt Renovation / Harry Gugger Studio - Image 31 of 42](https://images.adsttc.com/media/images/5ee8/2bab/b357/6547/3e00/014a/newsletter/073_000_UM_PUBLICATION_4.jpg?1592273823)
![Silo Erlenmatt Renovation / Harry Gugger Studio - Exterior Photography, Facade, Concrete](https://images.adsttc.com/media/images/5ee8/2de0/b357/6520/0900/020a/medium_jpg/200514_SH_CK-4244_edited.jpg?1592274372)
The originally free-standing silo building is now integrated into a row of buildings along the Signalstrasse. Its neighbours are a house for students and a residential and work building for artists. Noise pollution from the adjacent motorway, high sustainability goals, and the internal spatial organisation characterise the project. As one of the first steel-reinforced concrete structures in Switzerland and with a unique inner industrial condition defined by a vertical division of spaces, our aim was to preserve and celebrate the genius loci.
![Silo Erlenmatt Renovation / Harry Gugger Studio - Interior Photography, Concrete](https://images.adsttc.com/media/images/5ee8/2e73/b357/6547/3e00/0152/newsletter/LS_IMG_1230_edited.jpg?1592274497)
![Silo Erlenmatt Renovation / Harry Gugger Studio - Image 36 of 42](https://images.adsttc.com/media/images/5ee8/2b99/b357/6520/0900/01fc/newsletter/first_floor_plan.jpg?1592273808)
![Silo Erlenmatt Renovation / Harry Gugger Studio - Image 40 of 42](https://images.adsttc.com/media/images/5ee8/2d1e/b357/6520/0900/0205/newsletter/section_B.jpg?1592274198)
![Silo Erlenmatt Renovation / Harry Gugger Studio - Interior Photography, Glass](https://images.adsttc.com/media/images/5ee8/304e/b357/6547/3e00/0156/newsletter/LS_IMG_1923_edited.jpg?1592274971)
Throughout the design process, the building’s inner structure was always taken into account, safeguarding as much as possible of the existing fabric of the building and keeping disruptive interventions to a minimum. For this reason, the characteristic silo chambers have been preserved.
![Silo Erlenmatt Renovation / Harry Gugger Studio - Interior Photography, Stairs, Windows](https://images.adsttc.com/media/images/5ee8/2cf1/b357/6520/0900/0204/medium_jpg/200514_SH_CK-4200_edited.jpg?1592274122)
![Silo Erlenmatt Renovation / Harry Gugger Studio - Interior Photography](https://images.adsttc.com/media/images/5ee8/2d78/b357/6520/0900/0207/medium_jpg/200514_SH_CK-4209.jpg?1592274272)
They give to the building and to its new use a familiar scale. The new functions are achieved by the installation of only two new floor slabs and distribution cores. Porthole-like windows now provide ventilation, daylight, and a view to the outside without affecting the original tectonics of the façade. The guest rooms of the hostel are located on the 1st and upper floor on the street side. On the courtyard side towards the southwest, the studios are located on the 1st and upper floor. On the ground floor, the seminar rooms face the street and the restaurant opens up to the public courtyard with an outdoor seating area with catering.
![Silo Erlenmatt Renovation / Harry Gugger Studio - Interior Photography](https://images.adsttc.com/media/images/5ee8/2b8e/b357/6547/3e00/0149/medium_jpg/200301_Silo_CK_high_resol_IMG_3853_edited.jpg?1592273784)