Our Lady of the Assumption Catholic Primary School / BVN

Our Lady of the Assumption Catholic Primary School / BVN - Stairs, Beam, Handrail
© Brett Boardman, Michael Nicholson

Our Lady of the Assumption Catholic Primary School / BVN - Windows, FacadeOur Lady of the Assumption Catholic Primary School / BVN - Image 3 of 18Our Lady of the Assumption Catholic Primary School / BVN - Table, ChairOur Lady of the Assumption Catholic Primary School / BVN - Stairs, Beam, HandrailOur Lady of the Assumption Catholic Primary School / BVN - More Images+ 13

More SpecsLess Specs
Our Lady of the Assumption Catholic Primary School / BVN - Windows, Facade
© Brett Boardman, Michael Nicholson

Text description provided by the architects. Our Lady of the Assumption Catholic Primary School is a new K-6 school for 420 students in North Strathfield. The design is a realisation of the school’s vision of creating spaces that invite imagination, innovation and support independent learning and student wellbeing. The project reuses a rundown 1970s three-storey former Telstra training centre that was a typical institutional example of brutalist concrete architecture of its time.

Our Lady of the Assumption Catholic Primary School / BVN - Windows, Facade
© Brett Boardman, Michael Nicholson

The design needed to address a number of challenges presented by the site during a 2 stage process. Previously dark and cellular spaces within the building were opened up in stage 1 (Ground floor - 2015) through demolishing most of the walls and replacing the façade. Rounding out the second stage of works an additional level on top of the existing building, as well as a 4-storey atrium as main entry connecting all learning areas, a new hall, arts space, balconies and roof-top playgrounds have been added as a prefabricated mass-timber construction.

Our Lady of the Assumption Catholic Primary School / BVN - Facade
© Brett Boardman, Michael Nicholson

Flexible, open and inviting learning spaces support the school’s vision. Classes are situated on either side of a central circulation spine, that forms an extension to the learning spaces. The diverse range of learning options are supported by joinery with built-in nooks and withdrawal spaces and differentiation in ceiling heights. Furniture is movable, as are large sliding panels to allow easy reconfiguration of spaces by students to suit learning needs.

Our Lady of the Assumption Catholic Primary School / BVN - Windows, Beam
© Brett Boardman, Michael Nicholson

Visual connections between the street, playground, learning spaces and school administrative areas are enabled through the addition of a 4-storey atrium and the removal of most internal walls from the existing structure, replaced with transparent sliding panels and glass throughout. To maximise daylight penetration and enable natural ventilation, the external concrete façade of the existing building was replaced with high-performance timber framed double glazing. Very large sliding doors along classroom edges open to the external balconies, blurring the boundary between inside and outside.

Our Lady of the Assumption Catholic Primary School / BVN - Chair, Beam
© Brett Boardman, Michael Nicholson

With a wealth of research in support of timber being used in learning spaces to promote wellness and better learning outcomes, the material has been used throughout internal spaces extensively both as finish and structure. The benefits suggest increases in concentration, productivity and decreased stress levels. OLA is a model for sustainability through its innovations in construction by using engineered timber. The additions to the school feature Glulam, cross-laminated timber (CLT) walls and a CLT acoustic ceiling flooring system.

Our Lady of the Assumption Catholic Primary School / BVN - Table
© Brett Boardman, Michael Nicholson

The benefits of using timber are high quality, precise and environmentally friendly construction, as well as long term wellbeing for occupants and an energy efficient use of the school. The exterior of the existing concrete structure and new CLT additions are clad in a highly insulated, custom perforated zinc cladding façade with double glazed, airtight high-performance timber/aluminium windows. The collaboration between structural engineers, fire engineers and services consultants played a crucial role in the success of the project. The prefabricated CLT floor/acoustic ceiling system has also significantly reduced the overall cost of the project, established during the 6-month value engineering process after tender.

Our Lady of the Assumption Catholic Primary School / BVN - Table, Chair
© Brett Boardman, Michael Nicholson

Project gallery

See allShow less

Project location

Address:North Strathfield NSW 2137, Australia

Click to open map
Location to be used only as a reference. It could indicate city/country but not exact address.
About this office
Cite: "Our Lady of the Assumption Catholic Primary School / BVN" 28 Apr 2019. ArchDaily. Accessed . <https://www.archdaily.com/914735/our-lady-of-the-assumption-catholic-primary-school-bvn> ISSN 0719-8884

© Brett Boardman, Michael Nicholson

圣母升天天主教小学,将粗野主义建筑改造为木建筑 / BVN

You've started following your first account!

Did you know?

You'll now receive updates based on what you follow! Personalize your stream and start following your favorite authors, offices and users.