the world's most visited architecture website
All
Projects
Products
Events
Competitions
  1. ArchDaily
  2. Projects
  3. Educational Architecture
  4. Switzerland
  5. Savioz Fabrizzi Architectes
  6. 2014
  7. Primary School in Châteauneuf Sion / Savioz Fabrizzi Architectes

Refurbishment in Architecture

presented by the MINI Clubman

Primary School in Châteauneuf Sion / Savioz Fabrizzi Architectes

  • 03:00 - 5 March, 2015
Primary School in Châteauneuf Sion / Savioz Fabrizzi Architectes
Primary School in Châteauneuf Sion / Savioz Fabrizzi Architectes, © Michel Bonvin
© Michel Bonvin

© Michel Bonvin © Michel Bonvin © Michel Bonvin © Michel Bonvin + 15

  • Civil Engineer

    Sd Ingénierie
  • Hvac Engineer

    Gd Climat
  • Electrical Engineer

    Rtm Réalisation Techniques Multiples
  • More Specs Less Specs
© Michel Bonvin
© Michel Bonvin

Text description provided by the architects. The extension to the school complex is on the west side of the site, in continuity with the existing school which runs along the rue de la treille. It is joined to the existing buildings, with which it forms a single functional unit.

© Michel Bonvin
© Michel Bonvin

The extension provides an opportunity to improve the relationship between the school complex and the public space in the street (currently a blank wall of the emergency shelter.

© Michel Bonvin
© Michel Bonvin

Typology

The new school is organised as two spatial and pedagogical units, a familiar space, whose scale is between that of the classroom and the school. These units comprise two classrooms, and a multipurpose area that is the core of each unit.

Second Floor Plan
Second Floor Plan

The classrooms are designed as spaces with openings on all four sides, offering multiple relationships with the environment: the sunshine of the south side and the view over the grass roof, the view of the hill to the north, distant views along the valley and a relationship with the multipurpose area.

© Michel Bonvin
© Michel Bonvin

Construction

The choice of materials for the project is inspired by the existing school complex. The base is of exposed concrete and the superstructure is covered with slate, like the roofs of the complex.

© Michel Bonvin
© Michel Bonvin

The two storeys of classrooms are built using a wooden frame to allow earthquake-resistant construction over the public emergency shelter without altering the structure of the latter. This type of construction makes it possible to use prefabricated components, which are rapidly assembled, reducing the inconvenience when the school complex is in use.

© Michel Bonvin
© Michel Bonvin

The classrooms have wood on the internal walls, with floors and ceilings finished in mineral materials. Cement screed is used for the floor (for sound insulation and thermal mass) while the ceiling consists of perforated cement-based panels to absorb sound.

© Michel Bonvin
© Michel Bonvin

View the complete gallery

Location to be used only as a reference. It could indicate city/country but not exact address.
About this office
Cite: "Primary School in Châteauneuf Sion / Savioz Fabrizzi Architectes" 05 Mar 2015. ArchDaily. Accessed . <https://www.archdaily.com/602594/primary-school-chateauneuf-sion-savioz-fabrizzi-architectes/> ISSN 0719-8884

You've started following your first account!

Did you know?

You'll now receive updates based on what you follow! Personalize your stream and start following your favorite authors, offices and users.