
-
Architects: Mario Cucinella Architects
- Area: 1700 m²
- Year: 2020
-
Photographs:Giovanni De Sandre
-
Lead Architects: Mario Cucinella
-
MEP: STEP Engineering Srl, STEP Engineering

Text description provided by the architects. The project of the new office building of Bayker-Iperceramica was born to be a simple and functional envelope, characterized by a strongly contemporary image. The new headquarters will be developed on two levels above ground for a total of approximately 1,700 square meters. The load-bearing structures were designed in prefabricated exposed wood elements (laminated wood pillars, load-bearing partitions, and X-Lam floors), thus ensuring the use of the latest construction technologies in terms of materials, sustainability and prefabrication systems.


















