
-
Architects: Penda China
- Area: 2720 m²
- Year: 2020
-
Photographs:Zhi Xia
.jpg?1609846007)
Text description provided by the architects. Wenming East Tunnel is 4380m at its full length (2720m for the underground 6-lane dual carriageway) with a maximum depth of over 23m. It is the first tunnel to be constructed underneath the Nandu River; vehicles traveling within the tunnel may drive at a maximum speed of 60km/h on the motorway, with a reduced speed limit of 40km/h at road junctions.


.jpg?1609846220)
.jpg?1609845894)
.jpg?1609845906)
.jpg?1609845951)
.jpg?1609846260)
.jpg?1609846251)
.jpg?1609846033)
.jpg?1609846007)
.jpg?1609845925)
.jpg?1609845932)
.jpg?1609845867)
.jpg?1609845886)
.jpg?1609845913)
.jpg?1609846182)
.jpg?1609845945)
.jpg?1609845986)
.jpg?1609845974)
.jpg?1609845967)
.jpg?1609846170)
.jpg?1609845848)
.jpg?1609846026)
.jpg?1609845994)
.jpg?1609845850)
.jpg?1609846204)
.jpg?1609846015)
.jpg?1609846054)
.jpg?1609846133)
.jpg?1609846096)
.jpg?1609845431)
.jpg?1609845528)
.jpg?1609845422)
.jpg?1609845546)
.jpg?1609845653)
.jpg?1609845758)
.jpg?1609845710)
.jpg?1609845692)
.jpg?1609845670)
.jpg?1609845627)
.jpg?1609845610)