
- Area: 3100 m²
-
Photographs:Rob ‘t Hart
Text description provided by the architects. The new building for the high school replaces a former auditorium, adding a significant amount of learning area. It smoothly curls between the existing main building and is connected by the atrium, the auditorium and on the upper level the biology, physics and chemistry classes. Key issues for this task were a healthy indoor climate, inviting architecture and an optimum integration in the green surroundings. More photographs and drawings following the break.









