ecoSuites, A Reed-Clad Hotel / Alex A. Tsolakis Architecture

ecoSuites, A Reed-Clad Hotel / Alex A. Tsolakis Architecture

© Alex A. Tsolakis © Alex A. Tsolakis © Alex A. Tsolakis © Alex A. Tsolakis + 41

  • Area Area of this architecture project Area: 900.0 m2
  • Year Completion year of this architecture project Year: 2018
  • Photographs Photographs: Alex A. Tsolakis
  • Manufacturers Brands with products used in this architecture project
    Manufacturers: 157+173 designers, Alumil, Bright Lighting, Pyramis Group, Scarabeo, TON
  • Lighting & furniture design

    Alex A. Tsolakis, 157+173 designers.
  • Structural Engineer

    Andreas Khlioumis. Swimming Pool Engineer: Intel Water
More Specs Less Specs

Text description provided by the architects. Hotel extension, Tristinika Beach, Greece. The camouflaged hotel. The swimming pool facade (NE-NW) is completely covered with sliding panels clad in local reed that grows on the hotel site. The reed panels hide the full-height glass windows behind them, creating a softer, more discreet, non-reflective facade that blends into the natural surroundings. At the same time, the sliding reed panels provide sun protection and privacy to the inhabitant, as they enable guests to transform their balconies into private outdoor rooms.

The SE-SW facade features vertical wooden planks, that indicate the private entrance to each suite. The wooden facade blocks direct sunlight, while letting the sea breeze circulate through the suites. The rooms of the suites flow into one another, and the huge glass sliding windows blur the boundary between inside and outside. The open floor plan and its orientation work together with the facades, keeping interiors cool during the summer heat. As the new ecoSuites are an addition to an existing hotel, the existing buildings and view orientations had to be considered.

© Alex A. Tsolakis
© Alex A. Tsolakis
Ground floor plan
Ground floor plan
© Alex A. Tsolakis
© Alex A. Tsolakis

Each suite floor plan is pivoted and shifted within the building envelope for optimum orientation. The design involved local materials, local labour, handcrafted furniture and flooring. Structural steel was utilized for the frame and precast concrete for all the wall partitions. On-site construction time amounted to 4 months for 900m2.

Project gallery

See all Show less

Project location

Address: Tristinika Beach, Greece

Location to be used only as a reference. It could indicate city/country but not exact address.
About this office
Cite: "ecoSuites, A Reed-Clad Hotel / Alex A. Tsolakis Architecture" 05 Oct 2018. ArchDaily. Accessed . <https://www.archdaily.com/903135/ecosuites-a-reed-clad-hotel-alex-a-tsolakis-architecture/> ISSN 0719-8884

You've started following your first account!

Did you know?

You'll now receive updates based on what you follow! Personalize your stream and start following your favorite authors, offices and users.