the world's most visited architecture website
i

Sign up now and start saving and organizing your favorite architecture projects and photos

Sign up now to save and organize your favorite architecture projects

i

Find the most inspiring products for your projects in our Product Catalog.

Find the most inspiring products in our Product Catalog.

i

Get the ArchDaily Chrome Extension and be inspired with every new tab. Install here »

i

All over the world, architects are finding cool ways to re-use run-down old buildings. Click here to see the best in Refurbishment Architecture.

Want to see the coolest refurbishment projects? Click here.

i

Immerse yourself in inspiring buildings with our selection of 360 videos. Click here.

See our immersive, inspiring 360 videos. Click here.

All
Projects
Products
Events
Competitions
Navigate articles using your keyboard
  1. ArchDaily
  2. Projects
  3. Energy Plant
  4. Switzerland
  5. Vincenzo Cangemi Architectes
  6. 2016
  7. Hydropower Plant Ragn d'Err / Vincenzo Cangemi Architectes

Hydropower Plant Ragn d'Err / Vincenzo Cangemi Architectes

  • 05:00 - 24 July, 2017
Hydropower Plant Ragn d'Err / Vincenzo Cangemi Architectes
Hydropower Plant Ragn d'Err / Vincenzo Cangemi Architectes, © Ralph Feiner
© Ralph Feiner

© Ralph Feiner © Ralph Feiner © Ralph Feiner © Ralph Feiner + 11

© Ralph Feiner
© Ralph Feiner

Text description provided by the architects. The Mulegn Powerplant is located approximately in the middle of the flat stretch of the Ragn d'Err stream between the Kantonsstrasse and the inflow into the Gelgia river, on the northern side of the stream. Access to the building is via the main road running parallel to Ragn d'Err stream. The building is designed so that it is as safe as possible in the event of flood.

© Ralph Feiner
© Ralph Feiner

The floor plan is an elongated rectangle with a width of 11.30 m and a length of 23.50 m. The roof is designed with 2 different pitches in the longitudinal direction and heights of approx 5.0 and 11.0 meters. The base and the roof are realized so to follow the surrounding terrain slope. The supporting structure is made of concrete, also visible from the outside. The building is acousting insulated and clad by a wooden planking.

Ground Floor Plan
Ground Floor Plan
© Ralph Feiner
© Ralph Feiner
Longitudinal Section
Longitudinal Section

The inside is illuminated by natural light seeping in through the wooden planks which at the same time protect from the heat. The roof is covered with cement stone slabs. The only opening is the two-door large access gate. This opens to the south, thus opposite to the village Tinizong, in order to keep the noise pollution as low as possible. The Powerplant has been designed to integrate at best with the surrounding landscape.

© Ralph Feiner
© Ralph Feiner

Thanks to the high engine heat, during the winter operating period the building shall be heated only to avoid the temperature to go as low as 6 ° C.

Cross-Section
Cross-Section
Location to be used only as a reference. It could indicate city/country but not exact address. Cite: "Hydropower Plant Ragn d'Err / Vincenzo Cangemi Architectes" 24 Jul 2017. ArchDaily. Accessed . <https://www.archdaily.com/876358/hydropower-plant-ragn-derr-vincenzo-cangemi-architectes/> ISSN 0719-8884