the world's most visited architecture website
All
Projects
Products
Events
Competitions
  1. ArchDaily
  2. Projects
  3. Schools
  4. France
  5. Barré-Lambot Architects
  6. 2014
  7. École des Mines / Barré-Lambot Architects

École des Mines / Barré-Lambot Architects

  • 09:00 - 29 January, 2017
École des Mines / Barré-Lambot Architects
École des Mines  / Barré-Lambot Architects, © Philippe Ruault
© Philippe Ruault

© Philippe Ruault     © Philippe Ruault     © Philippe Ruault     © Philippe Ruault     + 15

    © Philippe Ruault
    © Philippe Ruault
    Site Plan
    Site Plan

    Text description provided by the architects. How does one build an extension without compromising the architectural layout that was initially developed on the site?

    A “belvedere/school” overlooking the Erdre Valley!

    © Philippe Ruault
    © Philippe Ruault

    Lining the landscape up with the horizon through this extension was made possible through a simple set-up: two platforms, one along the lower garden, and one flush with the upper garden, both opened by a patio embedded in the ground, revealing a 5.5 metre (18 ft.) gradient running north-south along the building’s foundations.

    © Philippe Ruault
    © Philippe Ruault

    Given its insertion into the ground itself, this installation preserves the existing view of the landscape from Building H. It avoids all bothersome projected shadows or masking effects onto the faculty apartments (Building I) located to the southeast, just below the site of this building. The abundant natural light in classrooms, laboratories and offices, is controlled by the installation of micro-perforated and motorized vents in the south and west façades. The installation of prestressed flooring guarantees crossing without the need for support beams along the width of each of the building’s wings. This confirmed project takes up its position on the site by respecting and underlining the architectural principles of the existing building.

    © Philippe Ruault
    © Philippe Ruault

    Product Description: We use materials in limited numbers and for their intrinsic quality. The solar shading system were specially developed by our agency in collaboration with the RENSON company.

    Section
    Section

    View the complete gallery

    Project location

    Location to be used only as a reference. It could indicate city/country but not exact address.
    About this office
    Cite: "École des Mines / Barré-Lambot Architects" 29 Jan 2017. ArchDaily. Accessed . <https://www.archdaily.com/803148/ecole-des-mines-barre-lambot-architects/> ISSN 0719-8884
    Read comments
    Read comments

    You've started following your first account!

    Did you know?

    You'll now receive updates based on what you follow! Personalize your stream and start following your favorite authors, offices and users.