the world's most visited architecture website
i

Sign up now and start saving and organizing your favorite architecture projects and photos

Sign up now to save and organize your favorite architecture projects

i

Find the most inspiring products for your projects in our Product Catalog.

Find the most inspiring products in our Product Catalog.

i

Get the ArchDaily Chrome Extension and be inspired with every new tab. Install here »

i

All over the world, architects are finding cool ways to re-use run-down old buildings. Click here to see the best in Refurbishment Architecture.

Want to see the coolest refurbishment projects? Click here.

i

Immerse yourself in inspiring buildings with our selection of 360 videos. Click here.

See our immersive, inspiring 360 videos. Click here.

All
Projects
Products
Events
Competitions
Navigate articles using your keyboard
  1. ArchDaily
  2. Projects
  3. Institutional Buildings
  4. The Netherlands
  5. Studioninedots
  6. 2016
  7. de Alliantie HQ / Studioninedots

de Alliantie HQ / Studioninedots

  • 22:00 - 13 April, 2016
de Alliantie HQ / Studioninedots
de Alliantie HQ / Studioninedots, © Peter Cuypers
© Peter Cuypers

© Peter Cuypers © Peter Cuypers © Peter Cuypers © Peter Cuypers + 29

  • Architects

  • Location

    The Netherlands, Larenseweg, Hilversum
  • Architect in Charge

    Studioninedots
  • Design Team

    Albert Herder, Vincent van der Klei, Arie van der Neut, Metin van Zijl
  • Area

    7940.0 sqm
  • Project Year

    2016
  • Photographs

  • Project team

    Stijn de Jongh, Jurjen van der Horst
  • Contractor

    Van Wijnen
  • Custom furniture

    Logge, Dylan & van Laatum, Fiction Factory
  • Signage

    Lesley Moore
  • Client

    de Alliantie
  • More Specs Less Specs
© Peter Cuypers
© Peter Cuypers

Text description provided by the architects. Major transformation project gives Lucent industrial site a new lease of life.

Studioninedots’ design transforms an existing 1970s office building on the Lucent site in Hilversum into the new headquarters of de Alliantie, a Dutch housing corporation. The most eye-catching intervention involves the removal of large areas of infill floors and walls from the sturdy concrete structure. This creates a spectacular four-storey-high void, the light and lively new heart of the building that connects the different departments.

© Peter Cuypers
© Peter Cuypers

In this way the concept of connection was integral to the design. The new headquarters functions to consolidate de Alliantie’s regional offices, and facilitate new interactions between both colleagues and visitors through collective functions, which are centred around the atrium. These functions include the lobby, restaurant, library and kitchenettes on each floor.

© Peter Cuypers
© Peter Cuypers

Spatially, the dynamic character of the atrium is accentuated by crisscrossing steel staircases, cantilevered balconies, walkways and vistas, but most of all through the void that zigzags within the concrete frame. This dynamism is also expressed on the facade: large glazed surfaces within the structural concrete framework cut out a Tetris-like form from the anthracite-coloured facade, which lends the building its prominent new identity.        

Floor Plan
Floor Plan

Internally it’s immediately clear that the removal of floors and walls has literally resulted in more space and daylight, which now floods the 22-metre-deep floor plates of the once dark building.

© Peter Cuypers
© Peter Cuypers

The structural framework in the atrium is infilled with perforated wooden panels and steel frames. Besides their acoustic function, the walls also incorporate various functions such as the kitchenettes, library, storage and displays. 

Diagram
Diagram

The former Lucent industrial site in Hilversum is currently being transformed into a mixed-use residential/commercial district. The last companies vacated the site in the 1980s, and two of the five office buildings were retained. Being in good condition, these two buildings could be renovated to easily gain a new life. In addition to designing de Alliantie’s headquarters, Studioninedots is also repurposing the second building into an apartment complex, due for completion at the end of 2016.

© Peter Cuypers
© Peter Cuypers

View the complete gallery

Location to be used only as a reference. It could indicate city/country but not exact address.
About this office
Studioninedots
Office
Cite: "de Alliantie HQ / Studioninedots" 13 Apr 2016. ArchDaily. Accessed . <https://www.archdaily.com/785388/de-alliantie-hq-studioninedots/> ISSN 0719-8884
© Peter Cuypers

de Alliantie总部/ Studioninedots