the world's most visited architecture website

Sign up now and start saving and organizing your favorite architecture projects and photos

Sign up now to save and organize your favorite architecture projects


Find the most inspiring products for your projects in our Product Catalog.

Find the most inspiring products in our Product Catalog.


Get the ArchDaily Chrome Extension and be inspired with every new tab. Install here »


All over the world, architects are finding cool ways to re-use run-down old buildings. Click here to see the best in Refurbishment Architecture.

Want to see the coolest refurbishment projects? Click here.


Immerse yourself in inspiring buildings with our selection of 360 videos. Click here.

See our immersive, inspiring 360 videos. Click here.

Navigate articles using your keyboard
  1. ArchDaily
  2. Projects
  3. Train Station
  4. Switzerland
  5. Dürig AG
  6. 2014
  7. Zürich Main Station / Dürig AG

Zürich Main Station / Dürig AG

  • 01:00 - 11 February, 2015
Zürich Main Station / Dürig AG
Zürich Main Station / Dürig AG, © Ruedi Walti
© Ruedi Walti

© Ruedi Walti © Ruedi Walti © Ruedi Walti © Ruedi Walti + 37

  • Architects

  • Location

    Zurich Main Station, 8001 Zürich, Switzerland
  • Design Team

    Baumann Armin, Brantschen Armin, Breckner Irene, Buckingham Bruce, Cornuz Gilbert, Domagalski Joanna, Dürig Jean-Pierre, Dürr Judith, Fitzi Otto, Handte Sandra, Isler Dominik, Kaufmann Isabelle, Kempf Simon, Kimmig Bettina, Kitanishi Luiza, Labhart Katharina, Laue Sacha, Noe Tobias, Ramser Benedict, Simic Sandra, Trottmann Simone, Wengle Martin
  • Area

    95000.0 sqm
  • Project Year

  • Photographs

  • Project coordination, civil engineering

    ig zalo, Basler & Hofmann AG, Esslingen und Pöyry Infra AG, Zürich
  • General Contractor

    uas unternehmen für architektur und städtebau ag, Zürich
  • Quantity surveillance and site supervision

    Caretta + Weidmann Baumanagement AG, Zuerich
  • Building services, fire protection, building physics

    Amstein + Walthert AG, Zürich
  • Acoustics

    BAKUS GmbH, Zürich
  • Water supply of fire protection

    IWAG Ingenieure AG, Zürich
  • Infrastructural facilities

    hrwehrle, Schachen
  • Railway engineering

    ig züriBT, Zürich
  • Client

    SBB CFF FFS Infrastruktur / Immobilien, Zürich
  • Cost

    CHF 660 Millions
  • Site Area

    33560 m2
  • More Specs Less Specs
© Ruedi Walti
© Ruedi Walti

Text description provided by the architects. Löwenstrasse Transit Station


The new underground Löwenstrasse transit station forms the centrepiece of the cross-city rail link. With its four railway tracks and two platforms it is situated below tracks 4 to 9 of the upper central station. The east end of the platform is aligned underneath the transverse hall of the historical main station, after which the tunnel descends beneath the River Limmat towards Oerlikon. Towards the west a ramp concludes by feeding the track into the existing rail network above the Langstrasse underpass and onwards to the railway lines running through the Limmat Valley. The layout of the Löwenstrasse station consciously borrows from the concept of the existing Museumstrasse regional railway station. The main difference, however, is that the platform level of the Löwenstrasse station is equipped with two 420-meter-long central platforms, allowing them, after the completion of all the building phases, to additionally accommodate longer intercity carriage compositions. Above the platform, which is situated 16 meters below ground, is a new shopping level, stretching both east and west and interrupted by the River Sihl, which flows beneath the main station. Three cross connections – the broadened Sihlquai passage, the new Gessnerallee passage and the extension of the existing Löwenstrasse passage – create short transfer routes and connect the Löwenstrasse station with other areas of the main station and the adjoining areas of the city.

Floor Plan
Floor Plan
© Ruedi Walti
© Ruedi Walti
Floor Plan
Floor Plan

Spatial Organisation and Access

Straightforward and clearly arranged access improves the general orientation in the underground sections of the complex. Generously dimensioned passages and halls facilitate free passenger flow. The three functionally differing levels – the platform level, the shopping level and the historical overground station hall – are strictly separated from each other in spatial terms. This differentiation is also expressed in the materialisation, creating readily identifiable locations.

© Ruedi Walti
© Ruedi Walti

Vertical Conveyance Cores

Vertical means of access such as stairs, escalators and lifts are formed as continuous solid-structure conveyance cores running through all the levels. Their geometry responds to the existing built surroundings, forming individual volumes that, in part, also perform structural functions, for instance acting as bearings for existing supports in the listed roof of the railway station. The fact that the track positions in the new underground station could not be aligned to mirror those in the platform hall above necessitated the development of a special solution for the passenger lifts emerging from the Löwenstrasse station by using slanted shafts. The inclined lift casings stand out spatially, acting as markers to the geometrical constraints of the infrastructure developments of the past decades.    

© Ruedi Walti
© Ruedi Walti

Shopping Level as Circulation Space

The design of the subterranean spaces creates a distinct, friendly and clear atmosphere. Light, smooth and stylish surfaces transform the shopping level into a modern shopping centre as a circulation space. In the process the same material and lighting concepts are applied in all of the halls and passages. Flanked by the stringent lighting concept, the simple and robust materialisation and colour scheme in the open shop fronts, the closed wall spaces, the floors and the ceilings creates a neutral spatial impression. The architecture is highly functional and dispenses with decoration. The shop-window displays, the advertising, the SBB wayfinding system and the people themselves impart enough colour to the spaces. The architecture forms a calm backdrop to the signage, the uses and the advertising.

© Ruedi Walti
© Ruedi Walti

Platform Level as Waiting Rooms

As the waiting rooms of the underground Löwenstrasse station the two platform complexes, together with the installation galleries, create islands of light. In contrast the tunnel walls, the railway tracks and the roofs over the tracks are kept dark. The basic illumination comes from strip lighting, attached respectively on the outer rims of each of the installation galleries. The warm colour temperature of the light source serves to accentuate this centralized spatial impression.

© Ruedi Walti
© Ruedi Walti
Location to be used only as a reference. It could indicate city/country but not exact address. Cite: "Zürich Main Station / Dürig AG" 11 Feb 2015. ArchDaily. Accessed . <> ISSN 0719-8884