
-
Architects
-
Location
Pte. Friedrich Bayer - Jardim São Luís (Zona Sul), São Paulo - SP, Brazil -
Architects in Charge
Roberto Loeb and Luis Capote -
Design Team
Damiano Leite, Chantal Longo -
Area
90.0 m2 -
Project Year
2013 -
Photographs

Text description provided by the architects. The City of São Paulo has few bridges only for cyclists and pedestrians.
In front of the Bayer headquarters, the bridge is located where the Pinheiros river meets the Canal of Guarapiranga’s dam. By connecting both sides of the river, the bicycle path parallel to the river is extended, and citizens, Bayer’s employees and the community around become closer to the metro station.
Besides connecting the two sides of the canal, the bridge generates a place to contemplate the landscape. Two metallic islands over concrete pilotes surve as support for the 90 meters lenth bridge. Those metallic islands are covered by vegetation, a reference to water-lilies, which were the conceptual reference for the project.

In order to maintain the canal navigability, the central span is movable: the two central parts of the linear structure rotate by using electrical motor.
