the world's most visited architecture website
i

Sign up now and start saving and organizing your favorite architecture projects and photos

Sign up now to save and organize your favorite architecture projects

i

Find the most inspiring products for your projects in our Product Catalog.

Find the most inspiring products in our Product Catalog.

i

Get the ArchDaily Chrome Extension and be inspired with every new tab. Install here »

i

All over the world, architects are finding cool ways to re-use run-down old buildings. Click here to see the best in Refurbishment Architecture.

Want to see the coolest refurbishment projects? Click here.

i

Immerse yourself in inspiring buildings with our selection of 360 videos. Click here.

See our immersive, inspiring 360 videos. Click here.

All
Projects
Products
Events
Competitions
Navigate articles using your keyboard
  1. ArchDaily
  2. Projects
  3. Landscape Architecture
  4. Spain
  5. EMF
  6. 2010
  7. Tudela-Culip Restoration Project / EMF + Ardevol

Refurbishment in Architecture

presented by the MINI Clubman

Tudela-Culip Restoration Project / EMF + Ardevol

  • 00:00 - 23 May, 2013
Tudela-Culip Restoration Project / EMF + Ardevol
Tudela-Culip Restoration Project / EMF + Ardevol, Courtesy of EMF
Courtesy of EMF

Courtesy of EMF Courtesy of EMF Courtesy of EMF Courtesy of EMF + 22

  • Architects

    J/T ARDÉVOLS S.L. Ton Ardèvol
  • Location

    Cadaqués, Girona, Spain
  • Landscape Architects

    Martí Franch
  • Project Year

    2010
  • Collaborators EMF

    Marta Bianchi, Monica Batalla, Adrià Alvarez, Gemma Batllori, , Claudia Gomes, Anna Lopez, Luis Ochoa, Emily Rivers, Mercè Solé, Céderic Paumier
  • Collaborators Ardèvols

    Raul Álvarez, Cristina Carmona
  • Commission

    : Ministerio de Medio Ambiente, Medio Rural y Marino. Generalitat de Catalunya.
  • Total Area

    90 ha
  • More Specs Less Specs
Plan
Plan

Precedents

Original State
Original State
Final State
Final State

In 1960, Club Med was constructed on the eastern tip of the Iberian Peninsula in one of the windiest and most northern exposed corners of the nation. Club Med was constructed as a private holiday village with 400 rooms that accommodated around 900 visitors in summertime. Life at Club Med was primitive, and meant to foster a relationship with nature. The settlement project is considered to be one of the most notorious examples of modern movement settlement in the Mediterranean coast.

Courtesy of EMF
Courtesy of EMF

With the rise of democracy and ecological conservation, Cap de Creus was declared a Natural Park in 1998. The cape, including the Club Med surroundings, was given the highest level of land protection because of its outstanding geological and botanical value. In the summer of 2003 Club Med was permanently closed, and in 2005, the 200 ha of property was acquired by the Spanish Ministry of Environment and a restoration project was active during 2005 and 2007.

Courtesy of EMF
Courtesy of EMF

In 2009-10, the Club Med settlement was ‘deconstructed’, its ecological dynamics revived and an innovative public use landscape project was begun for its rediscovery. Ensemble i In turn, the work became the Mediterranean´s coast biggest deconstruction & restoration project ever.

Approach

Courtesy of EMF
Courtesy of EMF

The project is related to an important aspect of what landscape architecture is about, namely identifying, unveiling and eventually transforming a site, to fit with what is already there. Revealing & celebration ‘the real’ landscape and its specificities.

Courtesy of EMF
Courtesy of EMF

Unlike the abstract, which attempts to neutralise specificity and establish the universality of the artefact, the Literal, the Real, connects with history, giving (elements or fabrics) the aura of authenticity by repetition, reflection or critique. Ian McDougall.

Courtesy of EMF
Courtesy of EMF

Indeed, the project´s goal was not to build or un-build, a landscape but to conceive the conditions for its experiencing. To do so, the process involved in-depth site reconnaissance and precise on-site cartography making. During the 5 years process, including the 14 months of work, the designers walked more than 200km on site, took and studied more than 15,000 images, and received up to 50 specialists in different fields related to nature restoration, in search for ways to optimize deconstruction, nature dynamic reclamation, and social valorization. The commission was approximated as an open process, enabling flexibility to integrate the discoveries following deconstruction. For instance the solution to enhance a ‘Pegmatite’ outcrop at the entrance was found and negotiated with the builder during work.

Courtesy of EMF
Courtesy of EMF

Constructively a minimalist approach was taken, reducing materials to those on site plus Cor-ten steel, for its landscape integration and its resistance to sea exposure, and using only few consistent construction details repeated through the site. ‘Robustness’ for a landscape that accepts little domesticities.