Text description provided by the architects. Boulevard Brewing Company desired a fast-track process for design and construction for an expansion project that would add (8) 40’-0” tall tanks to a 15’-0” tall existing structure. The tanks, planned for the production of hops beer, needed to be accessed 24 hours a day to regulate the addition of ingredients. BBC selected a project team assembled by an architect-led design-build delivery process to execute a complex assembly of components within very tight quarters. From the onset of the design process, the architect-builder had to plan the project to allow all adjacent space to remain open throughout construction.