Text description provided by the architects. This project’s task was transforming an existing project (reconstruction of a building accidentally found on a lot) for the Spectator Group’s Headquarters. When the project began, a building site was opened and excavation and construction pit protection works commenced, what defined the project’s character from the start. The previously designed reinforced-concrete frame system was kept, while the modifications within the construction system are tied to the staircase’s cores. The idea/work methodology was to essentially keep the constructive element’s state of design while keeping the construction interventions to a minimum.