the world's most visited architecture website
i

Sign up now and start saving and organizing your favorite architecture projects and photos

Sign up now to save and organize your favorite architecture projects

i

Find the most inspiring products for your projects in our Product Catalog.

Find the most inspiring products in our Product Catalog.

i

Get the ArchDaily Chrome Extension and be inspired with every new tab. Install here »

i

All over the world, architects are finding cool ways to re-use run-down old buildings. Click here to see the best in Refurbishment Architecture.

Want to see the coolest refurbishment projects? Click here.

i

Immerse yourself in inspiring buildings with our selection of 360 videos. Click here.

See our immersive, inspiring 360 videos. Click here.

All
Projects
Products
Events
Competitions
Navigate articles using your keyboard
  1. ArchDaily
  2. Projects
  3. Other
  4. Switzerland
  5. bauzeit architekten
  6. 2007
  7. Operation Center Burgergemeinde / bauzeit architekten

Operation Center Burgergemeinde / bauzeit architekten

  • 00:00 - 9 June, 2011
Operation Center Burgergemeinde / bauzeit architekten
Operation Center Burgergemeinde / bauzeit architekten, © Yves André
© Yves André

© Yves André © Yves André © Yves André © Yves André + 18

  • Architects

    bauzeit architekten / Roberto Pascual, Peter Bergmann, Yves Baumann
  • Location

    Biel/Bienne, Switzerland
  • Area

    1500.0 m2
  • Project Year

    2007
  • Photographs

Text description provided by the architects. The area of the operation center's complex extends to both sides of the street. To be able to guarantee good operating procedures, the program was concentrated on one side of the complex, two buildings forming a courtyard, which offers large outdoor areas and yet remains compact.

Ground Floor Plan
Ground Floor Plan

Following the topography of the land, two buildings forming an elongated shape area ends on a court for maneuvering. Its shell is made of strips of wood non-roughly or treated. It creates a vertically oriented texture, which in dialogue with the structure of the forest filtering the light and look. It creates a vertically oriented texture, which in dialogue with the structure of the forest stands and views and light possible. The building served as deposit and shelter for vehicles and machinery.

© Yves André
© Yves André

The building's head marks the entrance of warehouses and houses the surfaces of sale. The second building, at two levels, is positioned behind the first. It is covered with a simple wooden wall pierced by large windows. At ground floor, it houses the locker room, the carpentry workshop and the plant room, and the first floor, the administration.

© Yves André
© Yves André

View the complete gallery

Location to be used only as a reference. It could indicate city/country but not exact address.
About this office
bauzeit architekten
Office
Cite: "Operation Center Burgergemeinde / bauzeit architekten" 09 Jun 2011. ArchDaily. Accessed . <https://www.archdaily.com/141339/operation-center-burgergemeinde-bauzeit-architekten/> ISSN 0719-8884
Read comments
Read comments
© Yves André

Burgergemeinde操作中心 / bauzeit architekten

You've started following your first account!

Did you know?

You'll now receive updates based on what you follow! Personalize your stream and start following your favorite authors, offices and users.