SCI-Arc EDGE, Center for Advanced Studies in Architecture, will be graduating its first students at the end of this summer. All four postgraduate programs are currently in the final semester of the three-semester sequence and students are busy wrapping up their final projects.
To keep up with industry trends and important court decisions, every 10 years the AIA core set of contracts are reviewed and updated. The newly revised set of AIA contracts and forms were released April 2017. Major changes include a single Sustainable Project Exhibit that can be added to any AIA document to address the risks and responsibilities associated with sustainable projects; document title changes; new agreements containing a fill point to prompt the parties to discuss and insert an appropriate “termination fee” for terminations for convenience; and an added evaluation provision by the architect if the contractor proposes an alternative means and methods.
Saint-Gobain’s new corporate headquarters campus in Malvern, PA—the North American home to the world’s largest building materials company—is not a typical corporate campus. As the company approached its 350th anniversary, they set out to build a headquarters that would offer a dynamic showcase for its products.
The company assembled a team of designers from two firms—Bernardon and Jacobs—to transform a long-dormant site consisting of two office buildings into an integrated, world-class headquarters located in the suburbs of Philadelphia.
https://www.archdaily.com/875785/how-the-worlds-largest-building-materials-manufacturer-used-its-own-products-to-create-a-world-class-headquarters-for-its-employeesSponsored Post
Forget the white picket fence. Today’s American dream is more about the home that lies beyond the fence — the place where dreams are nourished, lives are enriched and memories are made.
But what is “home?” And how has the changing concept of the home influenced architecture over the last 50 years?
For award-winning architect Treff LaFleche, AIA, LEED, there has never been a more exciting time to be in architecture.
The Toni-Areal is a crucial part of the plan to breathe new life into Zürich West. The building was formerly a milk processing facility, and the new design by architecture firm EM2N features spaces for cultural events, as well as the Zürich University of the Arts and two departments of the Zürich University of Applied Sciences.
The Toni-Areal is one of the largest construction projects ever undertaken in Zürich and will be the largest construction site in Switzerland during its realization phase. The total usable floor space is 108,500 m2, of which the colleges comprise 84,500 m2. The remaining 23,500 m2 are dedicated to housing, cultural events, restaurants, and small retail shops, as well as parking and technology. The construction price—including basic upgrades and tenant upgrades—amounts to about 350 million Swiss francs.
As processes evolve, architects and designers need superior tools to transition their designs from vision to reality. Answering that call is the Vectorworks® 2013 product line from Nemetschek Vectorworks, Inc. This multi-dimensional software suite helps users implement Building Information Modeling (BIM) techniques and workflows and gain an edge in drawing, 3D modeling, integrated rendering, and high-quality presentations.