Situ Phoenix Island Hotel Renovation / ZhiXing Architects + Yongxinherui Engineering Consulting

Situ Phoenix Island Hotel Renovation / ZhiXing Architects + Yongxinherui Engineering Consulting - Exterior Photography, FacadeSitu Phoenix Island Hotel Renovation / ZhiXing Architects + Yongxinherui Engineering Consulting - Exterior Photography, Windows, FacadeSitu Phoenix Island Hotel Renovation / ZhiXing Architects + Yongxinherui Engineering Consulting - Interior Photography, Lighting, Windows, Beam, ColumnSitu Phoenix Island Hotel Renovation / ZhiXing Architects + Yongxinherui Engineering Consulting - Exterior Photography, CoastSitu Phoenix Island Hotel Renovation / ZhiXing Architects + Yongxinherui Engineering Consulting - More Images+ 47

Yiyang, China
  • Category: Hotels
  • Design Team: You Deng, Siyu Peng, Tao Xue
  • Structure: Hao Cui
  • Drainage Design: Yali Jian
  • Electricity: Yifan Deng
  • Client: Anhua Meishan City Investment Group
  • City: Yiyang
  • Country: China
More SpecsLess Specs
Situ Phoenix Island Hotel Renovation / ZhiXing Architects + Yongxinherui Engineering Consulting - Exterior Photography, Garden
© Yuanxiang Chen

Present situation. The project is located in the Zhexi Reservoir, Anhua County, Hunan Province. The project was formerly a timber factory with a history of more than 60 years. In the past two decades, it was abandoned due to the decline of the timber company and became an idle facility in the countryside. In 2019, it was established by Anhua Meishan City Investment Group Co., Ltd. invested and transformed it into a supporting homestay along the lake ring of the Zhexi Reservoir Scenic Area. It hopes to revitalize the idle resources in rural areas through design and transformation, then promotes the revitalization of local villages and the development of tourism. The site consists of five vacant buildings, namely the office building (Building 1) of the original timber company, the restaurant (Building 2), the dormitory (Building 3 and 5), and the pigsty (Building 4). Due to the large construction area and limited cost, we intend to use the principles of low cost, minimal intervention, and making the best use of the situation to carry out renovation and utilization from the perspective of rational allocation of the renovation budget. According to the respective positional relationship, landscape conditions, and morphological characteristics of the five buildings, find their respective appropriate functional positioning.

Content Loader

Project gallery

See allShow less
About this office
Cite: "Situ Phoenix Island Hotel Renovation / ZhiXing Architects + Yongxinherui Engineering Consulting" 30 May 2022. ArchDaily. Accessed . <https://www.archdaily.com/981885/situ-phoenix-island-hotel-renovation-zhixing-architects-plus-yongxinherui-engineering-consulting> ISSN 0719-8884

© Yuanxiang Chen

斯途·凤凰屿民宿改造 / 之行建筑事务所 + 永信和瑞

You've started following your first account!

Did you know?

You'll now receive updates based on what you follow! Personalize your stream and start following your favorite authors, offices and users.