![Øvre Vollgate 9 / Pushak - Beam](https://images.adsttc.com/media/images/5be1/9854/08a5/e5f7/ac00/01cd/medium_jpg/___Featured_Image.jpg?1541511232)
-
Architects: Pushak
- Area: 3000 m²
- Year: 2018
-
Photographs:Ivan Brodey
![Øvre Vollgate 9 / Pushak - Image 3 of 17](https://images.adsttc.com/media/images/5be1/98c3/08a5/e549/e300/0133/newsletter/_78A0132_3_4.jpg?1541511349)
Text description provided by the architects. The project is a transformation and complete refurbishment of a listed office building from 1892. The front building toward the street is completely rehabilitated, and the wings surrounding the inner courtyard are demolished and replaced with a new structure.
![Øvre Vollgate 9 / Pushak - Lighting, Stairs, Beam, Handrail](https://images.adsttc.com/media/images/5be1/9917/08a5/e549/e300/0134/medium_jpg/_78A9965_6_7.jpg?1541511429)
![](https://images.adsttc.com/media/images/5be1/97a0/08a5/e549/e300/012f/newsletter/section_CC.jpg?1541511061)
![Øvre Vollgate 9 / Pushak - Steel, Handrail, Beam](https://images.adsttc.com/media/images/5be1/9993/08a5/e549/e300/0137/medium_jpg/_78A9986.jpg?1541511550)
The courtyard is enclosed in the new building as a glass-covered interior atrium, that connects the old and the new building and admits daylight into the office spaces. All functions are accessed via the large, brass-clad main stair that stretches from the underground cafeteria to the roof terrace.
![Øvre Vollgate 9 / Pushak - Facade, Handrail, Beam](https://images.adsttc.com/media/images/5be1/983a/08a5/e5f7/ac00/01cc/medium_jpg/_78A0056_8_9_60.jpg?1541511206)