All
Projects
Products
Events
Competitions

CN Tower Reboot / Cumulus Architects

CN Tower Reboot / Cumulus Architects

© Lisa Logan © Lisa Logan © Lisa Logan © Lisa Logan + 21

Buildings  · 
Toronto, Canada
  • Architects Authors of this architecture project Cumulus Architects
  • Designers Authors of this architecture project Kyle Benassi, Nathaniel Mendiola, Mitchell Martyn, Denis Lemieux
  • Area Area of this architecture project
  • Project Year Brands with products used in this architecture project
    2018
  • Photographer Created with Sketch.
  • Manufacturers Brands with products used in this architecture project
    Artigo, Bravura, Corian (Willis), Geometrik, Inkan, McKeon, Nelson Industrial, Redspire Architectural Glass, Sloan Valve Company, UCSH
  • Lead Architect

    Sheldon Catarino
  • Designer

    Carolina Mellado
  • Electrical Consultant

    Mulvey and Banani International Inc.
  • Structural Consultant

    Read Jones Christoffersen
  • Mechanical Consultant

    The Mitchell Partnership Inc.
  • Audio/Visual

    Westbury International
  • Millworker

    Woodbecker, Guide, Holman
  • Constructor

    PCL Construction
  • Hospitality Designer

    MacKayWong
More Specs Less Specs
© Lisa Logan
© Lisa Logan

Text description provided by the architects. Cumulus and MackayWong, aims to upgrade the Canadian landmark and create a world-renowned viewing experience. The design concept revolves around the idea of uncluttering and releasing the perimeter edge of the observation level to maximize the impact of views and provide universal access for everyone, including those with mobility challenges. Reflective surfaces are added to extend the height of the space, and a flexible distributed audio-visual solution with infrastructure that accommodates scalability is included. A new glass floor has also been installed directly above the Tower’s original glass floor, providing a two-tier vertical view toward the ground.

© Lisa Logan
© Lisa Logan
© Lisa Logan
© Lisa Logan

Time capsule and signage displays have been added to provide educational content to visitors. Food and beverage areas are divided into three hubs – the “Waterfront Hub”, the “City Hub” and the “Lake Hub” – based on their location. Dispersing food and beverage from the former single restaurant, which took up more than half of the level and only generated 3% of the Tower's revenues, has made the space more suitable for multiple events of varying sizes and types.

© Lisa Logan
© Lisa Logan

Demand for early morning visits, late night corporate events, product launches and community announcements have already surpassed expectation – this is a testament to the business case approach championed by the Design-Build team. The Cumulus design has effectively transformed the CN Tower into a highly flexible and accessible event venue where Toronto’s coming of age is literally reflected in one of its most iconic structures.

© Lisa Logan
© Lisa Logan

Project gallery

See all Show less

Project location

Address: 301 Front St W, Toronto, ON M5V 2T6, Canada

Location to be used only as a reference. It could indicate city/country but not exact address.
About this office
Cite: "CN Tower Reboot / Cumulus Architects" 17 Sep 2018. ArchDaily. Accessed . <https://www.archdaily.com/899090/cn-tower-reboot-cumulus-architects/> ISSN 0719-8884
© Lisa Logan

加拿大国家电视塔改造升级,提供最大化视野俯瞰多伦多城市全景 / Cumulus Architects

You've started following your first account!

Did you know?

You'll now receive updates based on what you follow! Personalize your stream and start following your favorite authors, offices and users.