Architects: Ravetllat-Ribas
- Area: 3042 m²
- Year: 2016
-
Photographs:Adrià Goula
-
Manufacturers: Erxis, Escuredo talleres, Gascón fusters, Imperfexa, Muraltec, Reules 2001, Silmer solutions, Upton Connect
![](https://images.adsttc.com/media/images/58ad/ff8d/e58e/ce4c/d100/00a6/newsletter/01-exterior.jpg?1487798149)
Text description provided by the architects. The project saw the restoration of part of the former army barracks, dedicated to breeding horses, at La Remunta in Hospitalet de Llobregat, Barcelona.
![](https://images.adsttc.com/media/images/58ae/00ad/e58e/ce4c/d100/00b4/newsletter/25-antes.jpg?1487798437)
![](https://images.adsttc.com/media/images/58ad/ffef/e58e/ce4c/d100/00ab/newsletter/07-exterior.jpg?1487798248)
In agreement with the City Council, part of the enclosure has been converted to a public park and sites earmarked for the development of housing blocks. All remaining buildings on the site are protected.
![](https://images.adsttc.com/media/images/58ae/00a1/e58e/ce2b/4500/01a6/newsletter/24-antes.jpg?1487798426)
![](https://images.adsttc.com/media/images/58ae/001c/e58e/ce4c/d100/00ad/newsletter/09-interior.jpg?1487798293)
The old barracks consist of six building, four of which were the subject of this project. Building 1 included stables and a soldier's mess on the ground floor, and a dormitory for soldiers and officers on the first floor.
![](https://images.adsttc.com/media/images/58ae/0006/e58e/ce4c/d100/00ac/medium_jpg/18-_3d_3.jpg?1487798271)
![](https://images.adsttc.com/media/images/58ad/ffd9/e58e/ce4c/d100/00aa/medium_jpg/18-_3d_1.jpg?1487798225)
Buildings 3 and 4 are single storey, used only for horses. Building 5 was an infirmary and laboratory. The two other buildings that were not part of this project, an old farmhouse and Building 2, will be separately developed as a nursery.
![](https://images.adsttc.com/media/images/58ae/0011/e58e/ce2b/4500/01a0/newsletter/08-interior.jpg?1487798282)
The future use of the buildings is as yet unknown. The aim of project was to ensure the buildings were restored and protected from further dilapidation while a use compatible with the public park is found.
![](https://images.adsttc.com/media/images/58ae/0095/e58e/ce4c/d100/00b3/newsletter/14-interior.jpg?1487798415)
![](https://images.adsttc.com/media/images/58ae/0063/e58e/ce2b/4500/01a3/newsletter/22-Seccion-2.jpg?1487798364)
![](https://images.adsttc.com/media/images/58ae/0069/e58e/ce4c/d100/00b1/newsletter/12-interior.jpg?1487798372)
Non-protected buildings have been demolished and removed from the site, new roadworks have been completed and the park is already open to the public.