the world's most visited architecture website
i

Sign up now and start saving and organizing your favorite architecture projects and photos

Sign up now to save and organize your favorite architecture projects

i

Find the most inspiring products for your projects in our Product Catalog.

Find the most inspiring products in our Product Catalog.

i

Get the ArchDaily Chrome Extension and be inspired with every new tab. Install here »

i

All over the world, architects are finding cool ways to re-use run-down old buildings. Click here to see the best in Refurbishment Architecture.

Want to see the coolest refurbishment projects? Click here.

i

Immerse yourself in inspiring buildings with our selection of 360 videos. Click here.

See our immersive, inspiring 360 videos. Click here.

All
Projects
Products
Events
Competitions
Navigate articles using your keyboard
  1. ArchDaily
  2. Projects
  3. Town & City Hall
  4. The Netherlands
  5. Neutelings Riedijk Architects
  6. 2016
  7. Deventer City Hall / Neuteings Riedijk Architecten

Deventer City Hall / Neuteings Riedijk Architecten

  • 03:00 - 27 April, 2016
Deventer City Hall / Neuteings Riedijk Architecten
Deventer City Hall / Neuteings Riedijk Architecten, © Scagliola Brakkee
© Scagliola Brakkee

© Scagliola Brakkee © Scagliola Brakkee © Scagliola Brakkee © Scagliola Brakkee + 55

  • Architectural Engineering

    ABT, Adviesbureau voor Bouwtechniek bv, Velp, The Netherlands
  • Structural Engineering

    Aronsohn Constructies Raadgevende Ingenieurs bv., The Netherlands
  • Building Physics

    DGMR Raadgevende Ingenieurs bv, Arnhem, The Netherlands
  • Building Services

    Hiensch Engineering bv., Amsterdam, The Netherlands
  • Cost Consultancy

    Basalt Bouwadvies bv., Utrecht, The Netherlands

  • Interior - Fixed Interior

    Neutelings Riedijk Architecten, Rotterdam, The Netherlands
  • Interior- Detached Interior

    Atelier PRO, The Hague, The Netherlands
  • Interior Design - Raadzaal

    OTH, Amsterdam, The Netherlands
  • Landscape

    Bosch Slabbers tuin en landschapsarchitecten, Middelburg, The Netherlands
  • General Contractor

    BAM Utiliteitsbouw Regio Noordoost, Groningen, The Netherlands
  • Design “Deventer Framework”

    Loes ten Anscher, Deventer, The Netherlands
  • Sustainability Certificates

    BREEAM Excellent
  • More Specs Less Specs
© Scagliola Brakkee
© Scagliola Brakkee

Text description provided by the architects. The new city hall in Deventer unites the old historical city hall with a new city office. The new building complex is located at the ‘Grote Kerkhof’ and extends as far as the ‘Burseplein’. The 24.000 m2 large project consists of 20.000 m2 new buildings and 4.000 m2 renovation and restoration of existing listed monuments. The project consists of an entrance building with a main building behind it and unites all of Deventer’s employees, formerly divided over the city, under one new roof. It houses the city council and all municipal services and invigorates a formerly forgotten part of the inner city. 

© Scagliola Brakkee
© Scagliola Brakkee

COURTS AND SQUARES
The City Hall’s design seamlessly blends in with Deventer’s typical urban tradition of gardens and squares that are interconnected via alleys, lanes, pathways and gates. The building is organized around two new public squares: an open court surrounding the former mayor’s residence and a covered inner square; the building’s central hall where citizens, visitors and employees can meet one another. Adjacent to the office buildings in the Polstraat and Assenstraat two large city gardens are situated next to the neighbouring residential buildings. 

© Scagliola Brakkee
© Scagliola Brakkee

At ground floor level the building creates a link between the city’s two most important squares through a new continuous route that starts at the ‘Grote Kerkhof’, continues via the open Mayor’s Court and covered central hall to the Burseplein and ends at the main ‘Brink’ square. Perpendicular to this passage is a second walking route that connects the inner city with the IJssel river shore. Both are public routes. At the first level a closed circuit has been made for City Hall staff and employees connecting all historical buildings with the new ones. This route lies around the Mayor’s Court and enables a fast connection between all functions and departments. 

Plan
Plan

BUILDING AND ENVIRONMENT
The front building at the ‘Grote Kerkhof’ consists of two layers with a sloped roof and a facade composition with strong vertical lines, like its neighbouring buildings ‘de Hereeniging’ and the old city hall. This continuity makes the front building effortlessly fit in with its historical surroundings. By placing the roof backwards a city balcony is created. This makes the facade appear more separated, creating a recognizable facade at the ‘Grote Kerkhof’. 

© Scagliola Brakkee
© Scagliola Brakkee

The main building consists of three layers, like most buildings surrounding it. The tall vertical windows blend in with the architecture of the inner city and allow daylight to cast deep into the building, together with the skylight of the large hall. The main building has a roof surface consisting of alternating mansard roofs and green flat roofs, creating a skyline similar to its environment. The mansard roofs create spacious interiors in the attics. The roof terrace alongside the Mayor’s Court offers a panoramic view over Deventer’s inner city. 

Elevation
Elevation

FACADES AND ART
Open filigree wooden frames and closed brick volumes alternate within the facades. The stone facades consist of large block masonry with protruding window frames. The bricks are multi-coloured creating a lively image. The filigree facades consist of a grid of different sized oak wood frames. The oak framework provides space to integrate contemporary art in the building’s architecture. 

© Scagliola Brakkee
© Scagliola Brakkee

In collaboration with local artist Loes ten Anscher a series of aluminium grids was designed to fit within the oak framework, containing 2.264 unique fingerprints of 2.264 different citizens of Deventer. Spread out over the outer and inner facades of the building they form one large work of art. The visible presence of Deventer citizens in the facade turns the city hall into a true ‘Citizen House’. 

© Scagliola Brakkee
© Scagliola Brakkee

MATERIALS AND DETAILS
The city hall contains both public and private spaces that have received their own materialisation and detailing. Robust materials and sober details characterize the public spaces. The anthracite coloured natural stone floor leads the visitor from the different main and side entrances over the ground floor to all public spaces such as the central hall and the Mayor’s Court. The walls, stairs, columns and panelled ceilings are made out of concrete and finished with solid oak frames and fillings. The oak filigree facade with aluminium fingerprints is continued from the street to the interiors surrounding the court and central hall, making the interior part of the outer public space. The confined spaces are mainly situated in the main building and contain the city’s offices and back offices. Concrete and solid oak are used in combination with soft white and grey tones in the interior and furniture. 

© Scagliola Brakkee
© Scagliola Brakkee

SUSTAINABILITY
The Deventer City Hall is one the most sustainable public/government buildings in the Netherlands. Thanks to a clever design with tall spaces, vast amounts of daylight and air, optimized use of as many natural sources as possible, the implementation of green and multiple technical sustainable measures. 

© Scagliola Brakkee
© Scagliola Brakkee

The great amount of windows, roof lights and high ceilings allow natural light to enter the building everywhere, creating an agreeable working environment and simultaneously lowering the electricity consumption. The exposed concrete inside the building contributes to a high-quality, comfortable indoor environment: the concrete stores warmth or cold in various seasons. Concrete core conditioning is also used. The shed roof construction in the public hall prevents direct sunlight from entering and overheating the building. Ventilation ducts and grids in the windows and floors let fresh air seep into the building. By transporting this heated air out of the building via the atrium, surplus heat is used in an efficient way. The use of sunlight, rainwater and water from the IJssel river (for cooling and heating) increases the building’s sustainability with 25% as opposed to similar offices in the Netherlands. The City Hall received the Dutch sustainable GPR score of 8 to 9 as well as the international qualification BREEAM ‘Excellent’.

© Scagliola Brakkee
© Scagliola Brakkee

View the complete gallery

Location to be used only as a reference. It could indicate city/country but not exact address.
About this office
Neutelings Riedijk Architects
Office
Cite: "Deventer City Hall / Neuteings Riedijk Architecten" 27 Apr 2016. ArchDaily. Accessed . <https://www.archdaily.com/786251/deventer-city-hall-neulings-riedijk-architecten/> ISSN 0719-8884
Read comments
Read comments
© Scagliola Brakkee

代芬特尔市政厅 / Neulings Riedijk Architecten