the world's most visited architecture website
i

Sign up now and start saving and organizing your favorite architecture projects and photos

Sign up now to save and organize your favorite architecture projects

i

Find the most inspiring products for your projects in our Product Catalog.

Find the most inspiring products in our Product Catalog.

i

Get the ArchDaily Chrome Extension and be inspired with every new tab. Install here »

i

All over the world, architects are finding cool ways to re-use run-down old buildings. Click here to see the best in Refurbishment Architecture.

Want to see the coolest refurbishment projects? Click here.

i

Immerse yourself in inspiring buildings with our selection of 360 videos. Click here.

See our immersive, inspiring 360 videos. Click here.

All
Projects
Products
Events
Competitions
Navigate articles using your keyboard
  1. ArchDaily
  2. Projects
  3. Offices
  4. Belgium
  5. HUB
  6. 2012
  7. Greenville / Hub

Refurbishment in Architecture

presented by the MINI Clubman

Greenville / Hub

  • 01:00 - 12 December, 2014
Greenville / Hub
Greenville / Hub, © Ilse Liekens
© Ilse Liekens

© Ilse Liekens © Ilse Liekens © Ilse Liekens © Ilse Liekens + 28

  • Architects

    Hub
  • Location

    Centrum-Zuid, Centrum-Zuid 1111, 3530 Houthalen-Helchteren, Belgium
  • Partners

    bureau bouwtechniek, bas, rcr, bopro
  • Area

    6500.0 sqm
  • Project Year

    2012
  • Photographs

© Ilse Liekens
© Ilse Liekens

Text description provided by the architects. Greenville involves the renovation and partial restoration of the existing main building of the Houthalen-Helchteren mine site into an incubator for the cleantech industry. The incubator is part of the Cleantech Campus for which a master plan was recently drafted. The Cleantech Campus is in turn part of a redevelopment plan for the centre of Houthalen-Helchteren, which among others comprises the development of parklands, a residential zone and the NAC.

© Ilse Liekens
© Ilse Liekens

Our proposal aims to strengthen the relationship between the former mine site and the town centre. As such, it represents the completion of a chapter in the town’s history, while securing for it a place in the future.

© Ilse Liekens
© Ilse Liekens

In line with this evolution, the entire width of the northern façade of the incubator is opened up on the ground floor and converted into an entrance hall. Despite the fact that, architecturally speaking, the latter is subordinate to the historical entrance on the eastern side of the building, this intervention is nonetheless aimed at expressing the creation of a ‘second front’ facing the town centre.

Floor Plan
Floor Plan

Modifications to the existing building are also made in line with its use as an incubator and in order to guarantee contemporary and sustainable comfort and convenience inside the building.

© Ilse Liekens
© Ilse Liekens

The plan includes four new cores which contain the technical shafts and circulation within the building. These cores also form the struts for a new, suspended roof construction which houses the technical equipment while enabling a dramatic central atrium. Around this atrium, which is located on the second and third floors, the historical offices are converted into contemporary facilities with maximum conservation of the character of the existing elements. The atrium is also to be restored.

Greenville / Hub, © Ilse Liekens
© Ilse Liekens

The ground floor, which also had a more industrial character in the past, is to be internally stripped and converted into space for a reception, meeting room, visitors’ centre, exhibition space and hospitality facilities.

Section
Section

View the complete gallery

Location to be used only as a reference. It could indicate city/country but not exact address.
About this office
HUB
Office
Cite: "Greenville / Hub" 12 Dec 2014. ArchDaily. Accessed . <https://www.archdaily.com/570727/greenville-hub/> ISSN 0719-8884