the world's most visited architecture website
i

Sign up now and start saving and organizing your favorite architecture projects and photos

Sign up now to save and organize your favorite architecture projects

i

Find the most inspiring products for your projects in our Product Catalog.

Find the most inspiring products in our Product Catalog.

i

Get the ArchDaily Chrome Extension and be inspired with every new tab. Install here »

i

All over the world, architects are finding cool ways to re-use run-down old buildings. Click here to see the best in Refurbishment Architecture.

Want to see the coolest refurbishment projects? Click here.

i

Immerse yourself in inspiring buildings with our selection of 360 videos. Click here.

See our immersive, inspiring 360 videos. Click here.

All
Projects
Products
Events
Competitions
Navigate articles using your keyboard
  1. ArchDaily
  2. Projects
  3. Office Buildings
  4. Austria
  5. Baumschlager Eberle Architekten
  6. 2013
  7. 2226 / Baumschlager Eberle Architekten

2226 / Baumschlager Eberle Architekten

  • 00:00 - 26 November, 2013
2226 / Baumschlager Eberle Architekten
2226 / Baumschlager Eberle Architekten, © Eduard Hueber
© Eduard Hueber

© Eduard Hueber © Eduard Hueber © Eduard Hueber © Eduard Hueber + 20

  • Architects

  • Location

    Lustenau, Austria
  • Project Architect

    Jürgen Stoppel
  • Assistance

    Hugo Herrera Pianno, Markus Altmann
  • Structural Engineer

    Mader &Flatz
  • Light Planning

    Ingo Maurer
  • Energy Optimization

    PhD. Lars Junghans
  • Area

    13138.0 m2
  • Project Year

    2013
  • Photographs

      © Eduard Hueber
      © Eduard Hueber

      Text description provided by the architects. No cooling, no heating While buildings require less and less energy, more and more is being spent on the maintenance and service needed to sustain this reduction. The prospect of buildings functioning as power stations is highly reminiscent of the promises of Modernism. The only disruptive factor in this energy balance from an ideal world, however, is the human element. bebaumschlagereberle has no intention of replacing nature with technology in this office block in Lustenau, Austria. Their aim is rather to establish meaningful coherence for the user.

      © Eduard Hueber
      © Eduard Hueber

      The building has no heating, ventilation or cooling system, the flow of energy being controlled by software. Above all, however, this is a stone building with walls, doors and high-ceilinged rooms. It needs little grey energy, and elementary architectural means are used to create a sense of well-being that derives from the pleasant proportions and self-explanatory use. The constructional and energy-related foundations needed to achieve this effect illustrate the know-how bebaumschlagereberle has built up over 28 years. The envelope has a cavity wall structure with each wall consisting of 36-centimetre bricks.

      © Eduard Hueber
      © Eduard Hueber

      The inner layer of this interconnected shell ensures high compressive strength while the outer layer guarantees efficient insulation. Deep window reveals reduce the heat input, while vents fastened inside are controlled by sensors to provide a pleasant room climate. In winter, for example, the waste heat ensures a high energy input and the window vents only open if the volume of carbon dioxide in the room increases. During hot weather in summer the vents open at night to induce a draught for natural cooling. Sensors support, in a perhaps less controlled manner, the normal activity of the occupants of a building that in conceptual, aesthetic and everyday terms will retain its validity for a long time to come.

      Section
      Section

      View the complete gallery

      Location to be used only as a reference. It could indicate city/country but not exact address.
      About this office
      Baumschlager Eberle Architekten
      Office
      Cite: "2226 / Baumschlager Eberle Architekten" 26 Nov 2013. ArchDaily. Accessed . <https://www.archdaily.com/451653/2226-be-baumschlager-eberle/> ISSN 0719-8884
      Read comments
      Read comments