the world's most visited architecture website
i

Sign up now and start saving and organizing your favorite architecture projects and photos

Sign up now to save and organize your favorite architecture projects

i

Find the most inspiring products for your projects in our Product Catalog.

Find the most inspiring products in our Product Catalog.

i

Get the ArchDaily Chrome Extension and be inspired with every new tab. Install here »

i

All over the world, architects are finding cool ways to re-use run-down old buildings. Click here to see the best in Refurbishment Architecture.

Want to see the coolest refurbishment projects? Click here.

i

Immerse yourself in inspiring buildings with our selection of 360 videos. Click here.

See our immersive, inspiring 360 videos. Click here.

All
Projects
Products
Events
Competitions
Navigate articles using your keyboard
  1. ArchDaily
  2. Projects
  3. Theater
  4. Poland
  5. trabendo
  6. 2011
  7. Extension of the Polski Theater / trabendo + Arpa

Refurbishment in Architecture

presented by the MINI Clubman

Extension of the Polski Theater / trabendo + Arpa

  • 00:00 - 27 March, 2012
Extension of the Polski Theater / trabendo + Arpa
Extension of the Polski Theater / trabendo + Arpa, © Jeremi Buczkowski
© Jeremi Buczkowski

© Jeremi Buczkowski © Jeremi Buczkowski © Jeremi Buczkowski © Jeremi Buczkowski + 15

  • Architects

  • Location

    Poznan, Poland
  • Interior Design

    trabendo.
  • Design Team

    Jerzy Gurawski (Arpa), Lukasz Nowak (trabendo.), KatarzynaStawarz-Nowak (trabendo.)
  • Client

    Polski Theatre in Poznan, Poland
  • Area

    250.0 m2
  • Project Year

    2011
  • Photographs

Text description provided by the architects. The extension of the historical building of Malarnia – the Polski Theater in Poznan intimate scene includes the reconstruction of the existing theater space, improved by the new technical facilities, moreover creation of the new small building that links two of the existing buildings of the theater, and finally the construction of the underground storage facilities.

ground floor plan
ground floor plan

Behind the glass facade there is a small entrance foyer and the black box – central element of the new building - with cloakroom and toilets for the spectators. Above the enlarged theatrical space there is a suspended technical platform, that allows to take full advantage of the spatial qualities of Malarnia.

© Jeremi Buczkowski
© Jeremi Buczkowski

On the mezzanine there are rooms for technical staff. Because of the possibilities of creating any theatrical space as well as any auditorium arrangement, the new interior of the Malarnia building is the place of existing interactions between the stage and audience.

© Jeremi Buczkowski
© Jeremi Buczkowski

View the complete gallery

Location to be used only as a reference. It could indicate city/country but not exact address.
About this office
trabendo
Office
Arpa
Office
Cite: "Extension of the Polski Theater / trabendo + Arpa" 27 Mar 2012. ArchDaily. Accessed . <https://www.archdaily.com/220070/extension-of-the-polski-theater-trabendo-arpa/> ISSN 0719-8884
Read comments
Read comments
© Jeremi Buczkowski

波兰语剧院扩建 / trabendo Arpa