
- Area: 2130 m²
- Year: 2010
-
Photographs:Eloy Taboada
Text description provided by the architects. As the prow of a ship ready to weigh anchor and set sail, on the hammer of the main dock of the Outer Harbour of Ferrol, opened to the views of the estuary. To meet this landscaping challenge is used a formal repertoire of pure volumetrys, integrated into the geometry of the dam itself and, secondly, they rely on the proper forms of naval architecture. From a functional point of view, the building houses the program uses proposed by the Port Authority, allowing from its upper floors the total perimeter view of the port and the estuary. An external ramp system allows saving the difference in height between the sea wall of the dam and access to the roof.








