Renovation of the Monteiro Lobato Library / MMBB Arquitetos

Renovation of the Monteiro Lobato Library / MMBB Arquitetos - More Images+ 25

São Bernardo do Campo, Brazil
  • Architects: MMBB Arquitetos
  • Area Area of this architecture project Area:  1688
  • Year Completion year of this architecture project Year:  2014
  • Photographs
    Photographs:Federico Cairoli
  • Manufacturers Brands with products used in this architecture project
    Manufacturers:  AutoDesk, Trimble Navigation
  • Clients: Prefeitura de São Bernardo do Campo
  • Engineering: Grifa Engenharia
  • Installations: Fit Engenheiros Associados
  • Lighting Design: Lux Projetos Luminotécnicos
  • Scenic Design: Telem Iluminação e Cenotecnia
  • Acoustics: Sresnewsky Acústica e Tecnologia
  • Quantification And Budgeting: Raoni Nakamura, Lara Galvão
  • Authors: Marta Moreira, Milton Braga
  • Design Team: Adriano Bergemann, Cecília Góes, Gleuson Pinheiro, Guilherme Pianca, Lucas Vieira, Júlia Marques, Maria João Figueiredo, Martin Benavidez.
  • City: São Bernardo do Campo
  • Country: Brazil
More SpecsLess Specs

Text description provided by the architects. The building of the Monteiro Lobato Library was originally designed for the headquarters of the Brazilian Post and Telegraph Company.

© Federico Cairoli

The goal of the renovation project is to value the public facility so that it stands out in the city's dynamics. In general, interventions should recover the environmental conditions of the building, the square, and its surroundings; update the electro-electronic, hydraulic and air conditioning installation systems with better performance solutions for consumption; and ensure comfort and safety conditions for users and the archive.

© Federico Cairoli

The conditions and uses of the square's surroundings were examined to strengthen the potential of the urban context in which the Library is located.

© Federico Cairoli
Floor Plan - Ground Floor
© Federico Cairoli

On the ground floor, there shall be an open library, that is, direct public access to the general collection: after going through the entrance control, the visitor shall be free to access the books and handle them at the tables arranged throughout the room.

© Federico Cairoli

All masonry walls and non-structural elements will be demolished to form a single room filled with low and curvilinear bookshelves.

© Federico Cairoli

The entire facade will be assembled in fixed glass panels, with openings only on the upper part of the frame. A screen panel will be placed close to the glass for both mechanical and sun protection ( like a brise soleil). This way, avoiding the installation of fences around the perimeter of the lot, opening the library gardens to the city.

© Federico Cairoli

Also on the ground floor, an extension of the library will be built, as an attachment, in a concrete structure. In this new space, there will be a multipurpose room and a café, which may be accessed independently of the library's opening hours.

© Federico Cairoli

The second floor of the pre-existing building will be reserved for more private activities, such as administration, access to the rarer books and the Braille rooms.

© Federico Cairoli

Project gallery

See allShow less

Project location

Address:São Bernardo do Campo, São Paulo, Brazil

Click to open map
Location to be used only as a reference. It could indicate city/country but not exact address.
About this office
Cite: "Renovation of the Monteiro Lobato Library / MMBB Arquitetos" [Renovação da Biblioteca Monteiro Lobato / MMBB Arquitetos] 13 Aug 2019. ArchDaily. Accessed . <https://www.archdaily.com/922772/renovation-of-the-monteiro-lobato-library-mmbb-arquitetos> ISSN 0719-8884

© Federico Cairoli

蒙泰罗·洛巴托图书馆翻新 / MMBB Arquitetos

You've started following your first account!

Did you know?

You'll now receive updates based on what you follow! Personalize your stream and start following your favorite authors, offices and users.