
-
Architects: Tecto
- Area: 1655 m²
- Year: 2016
-
Photographs:Cosmin Dragomir
-
Manufacturers: Saint-Gobain, Isover, KLH, Metra, OPTIGREEN, Proclima, Warema, Zumtobel, pro clima

Text description provided by the architects. In March 2014, Tecto Arhitectura was appointed to design the new office building for HSR factory in Reci, Covasna, as the first large-scale project with CLT structure in south-east Europe. The main challenge was to create an office building for around sixty people that had to provide also a visual interface between two antagonistic spaces – an industrial platform used for production and a natural landscape with strong horizontal lines. The project purpose was to design a flag-ship two-storey office building with a massive timber structure (according to the Austrian and Romanian building regulations), that follows also the standards for Multi-Comfort criteria (according to the guidelines enlisted by Saint Gobain).




























