
-
Architects: BBK Architekten
- Area: 3 m²
- Year: 2016
-
Manufacturers: Agglotech, Bosshard Farben, Vogt group
-
Electrical Project: CSN engineering, Norbert Foser

Text description provided by the architects. Originally built in 1975, Balzers Sports Hall is a large multifunctional Sports facility with three gymnasiums, multi-use axillary rooms, and an indoor swimming pool open to the public. The renovation of the interior included the renewal of old flooring, updating fire protection systems as well as reinforcement of the primary building structure due to local seismic activity. In addition to the interior renovations, a new timber facade was designed to encase the existing building envelope - adding additional insulation to meet current Minergie standards.





























