the world's most visited architecture website
i

Sign up now and start saving and organizing your favorite architecture projects and photos

Sign up now to save and organize your favorite architecture projects

i

Find the most inspiring products for your projects in our Product Catalog.

Find the most inspiring products in our Product Catalog.

i

Get the ArchDaily Chrome Extension and be inspired with every new tab. Install here »

i

All over the world, architects are finding cool ways to re-use run-down old buildings. Click here to see the best in Refurbishment Architecture.

Want to see the coolest refurbishment projects? Click here.

i

Immerse yourself in inspiring buildings with our selection of 360 videos. Click here.

See our immersive, inspiring 360 videos. Click here.

All
Projects
Products
Events
Competitions
Navigate articles using your keyboard
  1. ArchDaily
  2. Projects
  3. Recreation & Training
  4. Germany
  5. Herrmann + Bosch Architekten
  6. 2011
  7. New Ice Skating Hall / Herrmann + Bosch Architekten

New Ice Skating Hall / Herrmann + Bosch Architekten

  • 05:00 - 6 February, 2016
New Ice Skating Hall / Herrmann + Bosch Architekten
New Ice Skating Hall / Herrmann + Bosch Architekten, © Ralf-Dieter Bischoff, Nürnberg
© Ralf-Dieter Bischoff, Nürnberg

© Ralf-Dieter Bischoff, Nürnberg © Ralf-Dieter Bischoff, Nürnberg © Ralf-Dieter Bischoff, Nürnberg © Ralf-Dieter Bischoff, Nürnberg + 13

© Ralf-Dieter Bischoff, Nürnberg
© Ralf-Dieter Bischoff, Nürnberg

Text description provided by the architects. The new ice skating center is located right in the middel of the sport - and recreation area of the Waldau in Stuttgart, Germany. The project developed in some steps. As there has been an unclosed ice skating complex closed to a small building for technic now it isdeveloped to a big covered ice skating hall and a smaller closed and ventilated ice skating hall with a service building in between.

Floor Plan
Floor Plan

The big skating hall built in the years of 70 had many defiencies in building physics. So the utilization was limited and the structure was damaged. The redevelopment of the ice skating hall got a new closed casing and a controlled heating and venting. The old building for technic was too small for the new necessary facilities. The landed property could not keep a second building so we had to demolish the old one and built a new, well organized technic building. The new house stand like a monolith between the hall 1 and 2 and is used from both of them. From the generous foyer with the transparency design you can see both of the skating halls with the sporting in it.

© Ralf-Dieter Bischoff, Nürnberg
© Ralf-Dieter Bischoff, Nürnberg

To keep the function of the hall two it was necessary to work in process and to use a interim arrangement.

© Ralf-Dieter Bischoff, Nürnberg
© Ralf-Dieter Bischoff, Nürnberg
Location to be used only as a reference. It could indicate city/country but not exact address. Cite: "New Ice Skating Hall / Herrmann + Bosch Architekten" 06 Feb 2016. ArchDaily. Accessed . <https://www.archdaily.com/781554/new-ice-skating-hall-herrmann-plus-bosch-architekten/> ISSN 0719-8884
Read comments
Read comments