the world's most visited architecture website
i

Sign up now and start saving and organizing your favorite architecture projects and photos

Sign up now to save and organize your favorite architecture projects

i

Find the most inspiring products for your projects in our Product Catalog.

Find the most inspiring products in our Product Catalog.

i

Get the ArchDaily Chrome Extension and be inspired with every new tab. Install here »

i

All over the world, architects are finding cool ways to re-use run-down old buildings. Click here to see the best in Refurbishment Architecture.

Want to see the coolest refurbishment projects? Click here.

i

Immerse yourself in inspiring buildings with our selection of 360 videos. Click here.

See our immersive, inspiring 360 videos. Click here.

All
Projects
Products
Events
Competitions
Navigate articles using your keyboard
  1. ArchDaily
  2. Projects
  3. Offices
  4. Switzerland
  5. Burckhardt Partner
  6. 2012
  7. New Office and Production building / Burckhardt + Partner

New Office and Production building / Burckhardt + Partner

  • 01:00 - 27 May, 2013
New Office and Production building / Burckhardt + Partner
New Office and Production building / Burckhardt + Partner, © Hansueli Schärer
© Hansueli Schärer

© Hansueli Schärer © Hansueli Schärer © Hansueli Schärer © Hansueli Schärer + 13

© Hansueli Schärer
© Hansueli Schärer

Text description provided by the architects. The decision to bring the various sites together under one roof paved the way for the new Sputnik Engineering AG production and administration building in Biel. Burckhardt+Partner AG won the invited competition in the year 2009.

© Hansueli Schärer
© Hansueli Schärer

The dimensions of the new building, with a length of around 132 m, a width of about 90 m and a built-over area of 11,800 m², are not everyday dimensions and provide space for up to 500 staff. The construction method, with prefabricated elements in concrete, steel and wood, enabled this substantial construction volume to be realized in around 14 months.

© Hansueli Schärer
© Hansueli Schärer

The spacious lobby, which can be used as an exhibition space, the staff restaurant, the production rooms and the storage rooms are situated on the two-story first floor. High flexibility regarding the positioning of production lines is guaranteed, thanks to the open floor plan. The office wings on the two upper floors are arranged around a greened interior courtyard and interconnected by a communication zone. The open-plan offices are divided into zones by office cubicles which can be used as individual offices or as meeting rooms.

© Hansueli Schärer
© Hansueli Schärer

The continuous wooden facade joins the building's various usable spaces to form a unit. It makes a substantial contribution to the sustainability of this office and production building, while discreetly contrasting with the surrounding buildings in this industrial area. In this Minergie-certified new building, environmental compatibility and energy efficiency play a key role: the electricity consumption is completely covered by renewable energies, including a significant portion covered by the photovoltaic system on the roof.

Floor Plan
Floor Plan

View the complete gallery

Location to be used only as a reference. It could indicate city/country but not exact address.
About this office
Burckhardt Partner
Office
Cite: "New Office and Production building / Burckhardt + Partner" 27 May 2013. ArchDaily. Accessed . <https://www.archdaily.com/377306/new-office-and-production-building-burckhardt-partner/> ISSN 0719-8884
Read comments
Read comments