təməsew̓txʷ Aquatic and Community Centre / hcma architecture + design

təməsew̓txʷ Aquatic and Community Centre / hcma architecture + design - Exterior Photography, Windows, Facadetəməsew̓txʷ Aquatic and Community Centre / hcma architecture + design - Interior Photographytəməsew̓txʷ Aquatic and Community Centre / hcma architecture + design - Interior Photography, Facade, Bench, Beamtəməsew̓txʷ Aquatic and Community Centre / hcma architecture + design - Image 5 of 33təməsew̓txʷ Aquatic and Community Centre / hcma architecture + design - More Images+ 28

  • Principal In Charge: Paul Fast (Architect AIBC, MRAIC)
  • Consulting Partner: Darryl Condon (Architect AIBC, AAA, SAA, OAA, FRAIC, LEED® AP)
  • Project Architect: Alexandra Kenyon (Architect AIBC, MArch, BDes)
  • Senior Architect: Ian McLean (Architect AIBC, LEED AP)
  • Architect Registered In Ireland: Maeve Counihan (Architect MRIAI, LEED GA, March, BScArch)
  • Technical Director: Rob Wilson (Dip Arch Tech, BSc)
  • Architect: Michael Dimock
  • Intern Architects: Elena Bushell, Katherine Mathers
  • Architectural Technologist: Nicole Laguit
  • Senior Director Of Sustainability: Rebecca Holt
  • Building Performance Advisor: Zina Berrada
  • Sustainability Coordinator: Natalia Mulekova
  • Senior Director Of Social Impact: Marni Robinson
  • Inclusive Design Advisor: Fiona Jones
  • Wayfinding And Signage Designer: Alice Rooney
  • Wayfinding And Signage Technologist: Maianne Capellan
  • Production Lead: Judy Bau
  • Cost Consultant: Ross Templeton
  • Public Art: James Harry
  • Wayfinding And Signage: HCMA
  • City: New Westminster
  • Country: Canada
More SpecsLess Specs
təməsew̓txʷ Aquatic and Community Centre / hcma architecture + design - Exterior Photography, Windows, Facade
© Nic Lehoux

Canada’s first completed aquatic centre to achieve Zero Carbon Building–Design Standard opens in New Westminster, BC. təməsew̓txʷ Aquatic and Community Centre has opened in New Westminster, British Columbia. Woven into the landscape with a dramatic unifying roof, the City’s largest capital project to date aims to be the heart and soul of the community and a place for all to connect.

Content Loader

Project gallery

See allShow less
About this office
Cite: "təməsew̓txʷ Aquatic and Community Centre / hcma architecture + design" 08 Aug 2024. ArchDaily. Accessed . <https://www.archdaily.com/1019855/t-at-m-at-sewtxw-aquatic-and-community-centre-hcma-architecture-plus-design> ISSN 0719-8884

© Nic Lehoux