![Docks In Aviles Port / [baragano]](http://ad009cdnb.archdaily.net/wp-content/uploads/2012/02/1329785017-tinglados-06-528x385.jpg)
Location: Avilés, Spain
Completion: 2008
Developer: ArcelorMittal, AGP [Actividades Generales Portuarias]
Collaborators: Estudios y Proyectos
Builder: Conrado Antuña, Arcelor Construcción
Budget: 1,212,275.70 euros
Surface area: 3,220 sqm
Photographer: Mariela Apollonio, Angel Sanchís
“If you want to build a boat, don’t start looking for wood, cutting planks or distributing the work, first you have to remind in men the longing of sea, free and wide”
Antoine de Saint-Exupéry
![Docks In Aviles Port / [baragano]](http://ad009cdnb.archdaily.net/wp-content/uploads/2012/02/1329785046-tinglados-07-528x386.jpg)
Because of the fast growth of the city, the new plan for the harbour [Innovation Island. Norman Foster] and neighbour building from Oscar Niemeyer, we are invited to propose an alternative to the existing project, a conventional industrial storage, with 120 m of facade to the city, this was the starting point.
We think in the idea of containers, a port image, placed in the mind of the people. The containers give shape to the facades and to the roof, breaking the building in colourful pixels that help to integrate the big scale building in the place, adding movement and colour to the area.
![Docks In Aviles Port / [baragano]](http://ad009cdnb.archdaily.net/wp-content/uploads/2012/02/1329785074-tinglados-08-528x393.jpg)
Over a dark socket, Metallic, built as a Hulk, born the tower, over the landscape, dialoguing with cranes and pipes, breaking again the continuity of the facade. This element will hold the logos of the companies that will use the building [ArcelorMittal and AGP] and is also the limit with the roof, the fifth facade of the building, very important because of the view from the planes that land and take off in the nearest airport.
The docks are built with steel, in a rational and logical way of building, bidding for the light construction. Structure and skin and are hundred per cent recyclable and demountable. Besides the steel used is more than seventy per cent from recycling material because it´s produced by the electrical furnace system.
- Courtesy of the architects
- Courtesy of the architects
- Courtesy of the architects
- Courtesy of the architects
- Courtesy of the architects
- Courtesy of the architects
- Courtesy of the architects
- Courtesy of the architects
- Courtesy of the architects
- Courtesy of the architects
- Courtesy of the architects
- elevations
- schemes
- sections
- site plan





![Docks In Aviles Port / [baragano] Docks In Aviles Port / [baragano] Courtesy of the architects](http://ad009cdnb.archdaily.net/wp-content/uploads/2012/02/1329785017-tinglados-06-125x125.jpg)
![Docks In Aviles Port / [baragano] Docks In Aviles Port / [baragano] Courtesy of the architects](http://ad009cdnb.archdaily.net/wp-content/uploads/2012/02/1329784918-mainimage-tinglados-02-125x125.jpg)
![Docks In Aviles Port / [baragano] Docks In Aviles Port / [baragano] Courtesy of the architects](http://ad009cdnb.archdaily.net/wp-content/uploads/2012/02/1329785046-tinglados-07-125x125.jpg)
![Docks In Aviles Port / [baragano] Docks In Aviles Port / [baragano] Courtesy of the architects](http://ad009cdnb.archdaily.net/wp-content/uploads/2012/02/1329785074-tinglados-08-125x125.jpg)
![Docks In Aviles Port / [baragano] Docks In Aviles Port / [baragano] Courtesy of the architects](http://ad009cdnb.archdaily.net/wp-content/uploads/2012/02/1329785091-tinglados-09-125x125.jpg)
![Docks In Aviles Port / [baragano] Docks In Aviles Port / [baragano] Courtesy of the architects](http://ad009cdnb.archdaily.net/wp-content/uploads/2012/02/1329785116-tinglados-10-125x125.jpg)
![Docks In Aviles Port / [baragano] Docks In Aviles Port / [baragano] Courtesy of the architects](http://ad009cdnb.archdaily.net/wp-content/uploads/2012/02/1329785133-tinglados-11-125x125.jpg)




Yes that’s right we need colour ;D