“Three in a Row” MAS Founder Pavilions / Crepain Binst Architecture

The MAS (Museum by the river), a must seen building itself, is currently exhibiting the Founder Pavilions, which give curious spectators a look at the here and now and into the future. In close cooperation with the Founders, Crepain Binst Architecture carefully designed a sophisticated setting symbolizing the unique character and essence of each Founder. Still, every pavilion is an added value to the whole MAS-experience. More images and architects’ description after the break.
Arteveldehoge School Campus Kantienberg Ghent / Crepain Binst Architecture

Architects: Crepain Binst Architecture
Location: Voetweg, Kantienberg, Belgium
Engineering: RCR Studiebureau
Acoustic advice: SCALA
Safety coordinator: PROBAM
General contractor: BESIX VLAANDEREN
Project area: 9,870 sqm
Project year: 2009
Photographs: Courtesy of Crepain Binst Architecture
Infrax West Offices / Crepain Binst Architecture

Architects: Crepain Binst Architecture
Location: Torhout, Belgium
Project Coach: Jan Geerts
Project Architect: Veerle Scarniet
Collaborator: Evi van Schooneveld
Interior Architect: An Steylaerts
Engineering: VK Engineering
Acoustic Advice: Avitech Acoustics
General Contractor: Van Laere nv
Site Area: 41,352 sqm
Project Area: 10,327 sqm
Project Year: 2008-2010
Photographs: Crepain Binst Architecture
