Cathedral Plaza / Westfourth Architecture

© Silviu Chiţu

Architects: Westfourth Architecture
Location: Bucharest,
Design Team: Vlad Arsene, Onar Gerelioglu, Lucia Stoll, Cristiana Ştefan, Mihaela Vasilescu, Daniel Bilan
Envelope Consultant: Aludesign
Structural Engineer: Popp şi Asociaţii
Project Year: 2010
Project Area: 26,000 sqm
Photographs: Andrei Mărgulescu, Silviu Chiţu


© Silviu Chiţu

Located on a site adjacent to the eastern wall of St. Joseph Cathedral, the building is set on the Southern third of the site in order to maintain undisturbed the view of the cathedral from Calea Victoriei, a major city thoroughfare. Both the plaza created between the tower and the cathedral and the tower itself, mark cathedral’s presence in the city. The eastern cathedral’s wall becomes the background for the new plaza, enhancing the vibrant role that the Catholic Church plays in the life of the city.

The tower’s core is placed asymmetrically towards the southern wall of the building, in order to set the office areas towards the north and the better natural light for a working environment. The structural system is composed of steel frames, braced diagonally along the perimeter walls. The north facade, towards the cathedral is clad with stone panels, while the irregular punched windows on this wall are marked by aluminum projecting frames. The southern facade features floor height glass panels and decorative vertical fins. On the west, the facade is set behind balconies which expose the vertical and diagonal steel frames.

Floor Plan

View this project in Google Maps

* Location to be used only as a reference. It could indicate city/country but not exact address.
Cite: "Cathedral Plaza / Westfourth Architecture" 18 Aug 2012. ArchDaily. Accessed 02 Aug 2014. <http://www.archdaily.com/?p=262550>

4 comments

  1. Thumb up Thumb down +5

    the building is alright but totally out of context.

  2. Thumb up Thumb down +2

    This building is done in haste, dangerous to the neighborhood, is removed from the Land Registry and from 2013 January 23 must be demolished, according to the final decision no. 456/2013 of the Court of Appeal Ploiesti