ArchDaily | Broadcasting Architecture Worldwidethe world's most visited architecture website
i

Sign up now and start saving and organizing your favorite architecture projects and photos

i

Find the most inspiring products for your projects in our Product Catalog.

i

Get the ArchDaily Chrome Extension and be inspired with every new tab. Install here »

h

Nominate now the Building of the Year 2017 »

All
Projects
Products
Events
Competitions
  1. ArchDaily
  2. Projects
  3. Museums & Exhibit
  4. United States
  5. Allied Works Architecture
  6. 2011
  7. Clyfford Still Museum / Allied Works Architecture

Clyfford Still Museum / Allied Works Architecture

  • 01:00 - 31 January, 2012
Clyfford Still Museum / Allied Works Architecture
Clyfford Still Museum / Allied Works Architecture, © Jeremy Bittermann
© Jeremy Bittermann

© Jeremy Bittermann © Jeremy Bittermann © Jeremy Bittermann © Jeremy Bittermann +30

From the architect. One first encounters the museum through a grove of trees and landscaped forecourt, which provides a place of contemplation, decompression, and transition from the museum’s surrounding urban context. Through the trees, the structure of the building is visible, consisting of cast-in-place architectural concrete walls with a variety of surface relief and texture. The façade features thin, vertical lines of concrete that project from the building’s surface in a fractured, organic, and random pattern, creating a rich surface that changes in the intense Denver sunlight and forms varied shadows across the building.

© Jeremy Bittermann
© Jeremy Bittermann

The entry is revealed beneath a canopy of trees, and visitors are welcomed into the museum by a low, long reception lobby. Visitors rise from the lobby and reception area toward the natural light falling from the galleries on the second floor. The museum’s second level features nine light-filled galleries, totaling approximately 10,000 square feet. Each gallery is distinctly defined and proportioned to respond to specific aspects and needs of the collection and helps trace the different phases of Still’s career in chronological sequence.

© Jeremy Bittermann
© Jeremy Bittermann

Gallery heights vary to accommodate changes in scale and media; those with 17-foot, 6-inch-high ceilings showcase Still’s monumental Abstract Expressionist canvases, some of which extend to over 12 feet tall and 16 feet long, while smaller galleries with 12-foot ceilings create a more intimate viewing environment for the presentation of smaller-scale paintings and works on paper. Two outdoor terraces and an education gallery offer visitors a moment of reflection and investigation during the gallery sequence, and allow them to re-orient themselves with the surrounding and distant landscape. Moving between galleries, visitors are provided glimpses down into the collection storage and interpretive galleries on the first level.

© Jeremy Bittermann
© Jeremy Bittermann

The visitor’s experience of the collection is enlivened by natural light that enters the galleries through a series of skylights over a cast- in-place, perforated concrete ceiling. The geometry of openings in the ceiling creates an even field of soft and changing daylight in the galleries. Diffusing glass, motorized shades, and electric light give curatorial flexibility to the gallery spaces, helping to support different gallery configurations and the museum’s rotating exhibition program.

© Jeremy Bittermann
© Jeremy Bittermann

Upon completing the primary gallery sequence, visitors may descend back to the museum’s first level to explore the painting storage, archive, and exhibition spaces viewable from above. An open double-high corridor connects these facilities and serves as an exhibition hall allowing visitors to further their learning of the history and life of Clyfford Still. A “timeline” section of the corridor places the artist’s work in context with historic events and other artistic movements, and an “archive” hallway presents the everyday artifacts of the artist’s life and information about his painting technique and media. From this corridor, visitors are also able to view the collection storage rooms, and assess the number of paintings produced during the artist’s prolific career. A visible conservation lab and a research center offer visitors additional resources for furthering their knowledge of Still’s career. This open corridor speaks to the institution’s founding principle of unveiling this once-private and very personal collection to the public, as it invites a gradual immersion in the works of Still.

Ground Floor Plan
Ground Floor Plan
Location to be used only as a reference. It could indicate city/country but not exact address. Cite: "Clyfford Still Museum / Allied Works Architecture" 31 Jan 2012. ArchDaily. Accessed . <http://www.archdaily.com/203388/clyfford-still-museum-allied-works-architecture-2/>
Read comments

24 Comments

Adam Duffill · April 29, 2012

Discovered this today. Simplicity at it&#39s best. http://t.co/LnizAoFY

John Whitaker · April 17, 2012

@ScottAllenHill true. Speaking of great arch, have you visited this yet? http://t.co/miksuaGy Were going when @Rach_Whit and I come visit.

Ian Colburn · February 16, 2012

Excellent... need to head home to ski and check this out:
http://t.co/blnS1Is0

Luis Durazo B · February 08, 2012

Clyfford Still Museum / Allied Works Architecture | ArchDaily http://t.co/6MAJnvw7 via @archdaily

ArquitecturaES · February 03, 2012

Clyfford Still Museum / Allied Works Architecture http://t.co/l4t583Nj #architecture

JVB Architects · February 02, 2012
Daniel González · February 02, 2012

Clyfford Still Museum / Allied Works Architecture | ArchDaily http://t.co/8iyoFXrP vía @archdaily

????? · February 02, 2012

Clyfford Still Museum / Allied Works Architecture | ArchDaily http://t.co/75CheEtD @archdaily?????Kansas???????????????????

chrisdrummond · February 01, 2012

Clyfford Still Museum: simplicity and strength of concept models are present in the finished building http://t.co/VqC2Y70N via @archdaily

Estefanía Álvarez · February 01, 2012

Clyfford Still Museum / Allied Works Architecture
http://t.co/2c1YgELq http://t.co/tw1vsOFI

Jasem Nadoum · February 01, 2012

Clyfford Still Museum / Allied Works Architecture | ArchDaily http://t.co/AXSB9pZS via @archdaily

Jasem Nadoum · February 01, 2012

Clyfford Still Museum / Allied Works Architecture http://t.co/AXSB9pZS via @archdaily

Matthias Hemelsoet · February 01, 2012

#architectuur Fantastisch licht en materiaalgebruik: Clyfford Still Museum / Allied Works Architecture http://t.co/gJsw5sZE

Andrew Tristero · February 01, 2012

A little love for #pdxdesign RT @ArchDaily: Clyfford Still Museum / Allied Works Architecture http://t.co/k1H71bnK #architecture

Jarodrigo · February 01, 2012

Clyfford Still Museum / Allied Works Architecture http://t.co/xKjHQ0qA #architecture

David Whitemyer, AIA · February 01, 2012

Clyfford Still Museum / Allied Works Architecture http://t.co/xKjHQ0qA #architecture

CADDesigns · February 01, 2012

Clyfford Still Museum / Allied Works Architecture http://t.co/xKjHQ0qA #architecture

Ornament and Crime · February 01, 2012

A stunning essay on the timeless beauty and potential of concrete.

Scott, Cox & Assoc. · February 01, 2012

Clyfford Still Museum / Allied Works Architecture http://t.co/0qvIA3aT via @archdaily

Dash · February 01, 2012

Clyfford Still Museum / Allied Works Architecture http://t.co/kbbrfE9X via @archdaily

Santi Maggio Savasta · February 01, 2012

Clyfford Still Museum / Allied Works Architecture http://t.co/KZ9LOy0e #Architecture #Architettura

e · February 01, 2012

Great finding @Still_Museum featured on Archdaily this morning. Allied Works did an amazing job! http://t.co/SGFgsMZD via @archdaily

ClyffordStillMuseum · February 01, 2012

? thx! RT @arch_daily: ArchDaily: Clyfford Still Museum / Allied Works Architecture http://t.co/NVtaexVo #architecture http://t.co/Qru7SHKU

Erik Joya · February 01, 2012

Clyfford Still Museum / Allied Works Architecture: Courtesy of Allied Works Architecture… http://t.co/wwxRriTr

···

Comments are closed

Read comments