The University of Nottingham - The Gateway Building / Make Architects

  • Architects: Make Architects
  • Location: Nottingham, UK
  • Collaborators: Couch Perry & Wilkes, Herbert Baggaley Construction Ltd, Price & Myers, Sand Project Management
  • Client: The University of Nottingham
  • Strawbale Specialists: Eurban
  • Area: 3100.0 sqm
  • Project Year: 2011
  • Photographs: Make Architects

© Make Architects © Make Architects © Make Architects © Make Architects

From the architect. Completed in May 2011 for The University of Nottingham, the new Gateway Building brings together the School of Biosciences and the School of Veterinary and Medical Sciences. The project is the first stage of a 20-year visionary masterplan which aims to expand the Sutton Bonington Campus and enhance its reputation as a leading destination for the study of plant and animal sciences.

© Make Architects
© Make Architects

Make has taken one of the most traditional building materials, straw, and elevated it into cutting edge, sustainable building technology. At present it is the largest straw-bale building in the UK. The landmark building has been designed to accommodate a wide range of different functions – offices, laboratories, seminar and computer rooms – while comfortably providing for many different users, including researchers, students, teachers and administration staff. To maximise the use of the space, the efficiency of the floorplate reaches an impressive 80 per cent.

© Make Architects
© Make Architects

Consciously contextual, the design was influenced by the campus’s agricultural heritage and strong sustainability policy. Taking inspiration from the rhythm of the line of trees adjacent to the site, the facade is innovatively formed from prefabricated modular straw bale panels, locally produced using straw sourced from the university’s own farmland.

elevation
elevation

Each 14m long panel consists of a cross-laminated timber frame filled with compressed straw and finished externally with render to provide a breathable coating that prevents decay and protects the straw from the external environment. These panels were prefabricated in an off-site ‘flying factory’ using local labour and delivered ready to be put in place.

© Make Architects
© Make Architects

The building materials weren’t the only locally-sourced resources; the project team consisted of local consultants, contractors and sub-contractors, and the vast majority of building supplies have come directly from the Nottinghamshire area.

© Make Architects
© Make Architects
Location to be used only as a reference. It could indicate city/country but not exact address. Cite:"The University of Nottingham - The Gateway Building / Make Architects" 26 Jan 2012. ArchDaily. Accesed . <http://www.archdaily.com/200413/the-university-of-nottingham-the-gateway-building-make-architects/>