We are currently in Beta version and updating this search on a regular basis. We’d love to hear your feedback here.

OSB Boards in Geroldsauer Mill | EGGER
  1. ArchDaily
  2. Products
  3. Wood
  4. OSB Boards in Geroldsauer Mill

OSB Boards in Geroldsauer Mill | EGGER

Share
  • Use

    Interior walls
  • Applications

    Structural reinforcement, pre-fabricated construction, timber systems
  • Characteristics

    Sustainability, durability, high load bearing, optimized tongue and groove profile, vapor barrier, airtight
The product has been saved to the folder: My Downloaded Products

More about this product

Geroldsauer Mill is a reinterpretation of a traditional mill in Germany. It is the largest European building completed in silver fir in the Black Forest region. The building with restaurant, exhibition space and market was erected in only 14 months on top of a reinforced concrete slab.

The outside wall elements were prefabricated using the timber frame construction method. The building is reinforced with EGGER OSB 4 TOP on the inside, which also created an airtight layer. The prefabricated façade made of silver fir was mounted on top of a 3 cm ventilation space. The photovoltaic system on the roof provides sustainable energy.

Only products from Germany were used. This was one of the reasons for the EGGER OSB 4 TOP board. The boards have a three-layer structure of micro-veneers or strands, which are approved for load-bearing construction. Their high quality and safety assisted in the acquisition of the general building permit. The tongue and groove profile guaranteed quick installation.

Message the manufacturer

Related Products

Structural wood boards in Freiland-Hof Home

EGGER

OSB Boards in METRO Market

EGGER
Send message