U.S. Embassy Guatemala City / The Miller Hull Partnership

U.S. Embassy Guatemala City / The Miller Hull Partnership - Exterior Photography, CityscapeU.S. Embassy Guatemala City / The Miller Hull Partnership - Exterior Photography, FacadeU.S. Embassy Guatemala City / The Miller Hull Partnership - Exterior PhotographyU.S. Embassy Guatemala City / The Miller Hull Partnership - Interior Photography, Chair, StairsU.S. Embassy Guatemala City / The Miller Hull Partnership - More Images+ 22

Guatemala City, Guatemala
  • Partner In Charge / Architect: Rob Misel
  • Project Manager / Architect: Mathew Albores
  • Architects: Cory Mattheis, Chris Grammens, Maaike Post, Sean Waldron, Jayme Van Oot, Jim Hanford, Eric Nothdurft, Whitney Pierce, Michelle Petersen,
  • Designer: Matthew Kikosicki
  • Client: U.S. Department of State Bureau of Overseas Buildings Operations (OBO)
  • Local Architect: Paredes + Aleman
  • Civil And Structural Engineer: Magnusson Klemencic Associates
  • Security Consultant: Hinman Consulting Engineers
  • Signage: Mayer Reed
  • Cost Estimating: Morris Wade
  • City: Guatemala City
  • Country: Guatemala
More SpecsLess Specs
U.S. Embassy Guatemala City / The Miller Hull Partnership - Exterior Photography, Cityscape
© Gabe Border

Text description provided by the architects. Located nine kilometers southeast of the city’s historic center, the new U.S. Embassy in Guatemala City consists of an 18,800-square-meter chancery building and support buildings with a below-grade garage. Working in collaboration with the Department of State’s Bureau of Overseas Buildings Operations (OBO) and the design-build team at B.L. Harbert International and Page, The Miller Hull Partnership’s design emphasizes the important diplomatic relationship between the United States and Guatemala and provides a first impression of the United States for many Guatemalans planning to visit the country.

U.S. Embassy Guatemala City / The Miller Hull Partnership - Exterior Photography, Facade
© Gabe Border

The Embassy is situated on a relatively small, steeply sloping lot, surrounded by a mountain valley and deep forested ravines. Using an innovative terracing method to stabilize the extreme topography and organize the site, the design team was able to integrate the campus program while providing generous outdoor gardens for both visitors and staff.

U.S. Embassy Guatemala City / The Miller Hull Partnership - Image 27 of 27
Site Plan

The office building emerges from the ground plane as two complementary bars, a stone base, and a glass tower. The base reflects an earthbound quality through its materiality and relationship to the site while the tower is characterized by openness and transparency. The conceptual form is reflective of the two countries, the stone base is inspired by Maya architecture and transforms into a light and airy tower to symbolize the optimistic, diplomatic relationship between Guatemala and the United States. Communal programs surround a courtyard at the intersection of the tower and base, which forms the heart of the building. A generous plaza and consular garden are shaded and protected by canopies, providing a hospitable waiting area for a large volume of consular visitors.

U.S. Embassy Guatemala City / The Miller Hull Partnership - Exterior Photography, Windows, Facade
© Gabe Border
U.S. Embassy Guatemala City / The Miller Hull Partnership - Exterior Photography, Facade
© Gabe Border

The new Embassy is located next to several significant green spaces including the Parque Ecologico Jacarandas de Cayala and Parque Ecologico y Deportivo Cayala. The design creates significant areas of forest and native vegetation that link to these spaces, providing water recharge, protection against natural disasters, and shelter for biodiversity.

U.S. Embassy Guatemala City / The Miller Hull Partnership - Interior Photography, Facade
© Gabe Border
U.S. Embassy Guatemala City / The Miller Hull Partnership - Interior Photography, Chair, Stairs
© Gabe Border
U.S. Embassy Guatemala City / The Miller Hull Partnership - Interior Photography, Living Room, Column
© Gabe Border

Targeted to exceed the Federal Performance Goals for energy efficiency and renewable energy, the Embassy reduces energy consumption by 26.5% over a comparable new building and provides 9% of the new office building’s energy consumption with solar photovoltaics. The Embassy is designed to reduce offsite flows by treating and reusing wastewater onsite, all irrigation water is supplied by this reclaimed resource. Additionally, the Embassy will match existing pre-development stormwater runoff flows using detention tanks which slow the release of water, mitigating risk to water quality and adjacent slope stability.

U.S. Embassy Guatemala City / The Miller Hull Partnership - Exterior Photography, Cityscape
© Gabe Border

Project gallery

See allShow less

Project location

Address:Guatemala City, Guatemala

Click to open map
Location to be used only as a reference. It could indicate city/country but not exact address.
About this office
Cite: "U.S. Embassy Guatemala City / The Miller Hull Partnership" 26 Sep 2023. ArchDaily. Accessed . <https://www.archdaily.com/1007343/us-embassy-guatemala-city-the-miller-hull-partnership> ISSN 0719-8884

You've started following your first account!

Did you know?

You'll now receive updates based on what you follow! Personalize your stream and start following your favorite authors, offices and users.