<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:wfw="http://wellformedweb.org/CommentAPI/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:atom="http://www.w3.org/2005/Atom" xmlns:sy="http://purl.org/rss/1.0/modules/syndication/" xmlns:slash="http://purl.org/rss/1.0/modules/slash/" xmlns:georss="http://www.georss.org/georss" xmlns:webfeeds="http://webfeeds.org/rss/1.0">
  <channel>
    <title>Expert: GKP Fassadentechnik AG | ArchDaily</title>
    <description>ArchDaily | Broadcasting Architecture Worldwide</description>
    <link>https://www.archdaily.com/</link>
    <lastBuildDate>Sat, 19 Sep 2026 00:00:00 +0000</lastBuildDate>
    <language>en-US</language>
    <atom:link rel="self" type="application/rss+xml" href="https://www.archdaily.com/show.xml"/>
    <sy:updatePeriod>hourly</sy:updatePeriod>
    <sy:updateFrequency>1</sy:updateFrequency>
    <webfeeds:logo>https://assets.adsttc.com/doodles/archdaily-logo-feedly.svg</webfeeds:logo>
    <webfeeds:accentColor>026CB6</webfeeds:accentColor>
    <webfeeds:analytics id="UA-73308-12" engine="GoogleAnalytics"/>
    <item>
      <title>
        <![CDATA[Verwaltungsgebäude Brugg Kabelwerke - Office Building / Tschudin Urech Bolt Architekten]]>
      </title>
      <link>https://www.archdaily.com/1004085/verwaltungsgebaude-brugg-kabelwerke-office-building-tschudin-urech-bolt-architekten</link>
      <pubDate>Mon, 17 Jul 2023 12:00:00 +0000</pubDate>
      <dc:creator>Hadir Al Koshta</dc:creator>
      <category>
        <![CDATA[Refurbishment]]>
      </category>
      <guid isPermaLink="false">https://www.archdaily.com/1004085/verwaltungsgebaude-brugg-kabelwerke-office-building-tschudin-urech-bolt-architekten</guid>
      <description>
        <![CDATA[<p class="p1">The reason for the Fifties high-rise refurbishment of the building, which was erected in 1956/57, was the high level of asbestos contamination and its poor energy balance. The office building had been valuable before, reports Marco Tschudin of Tschudin Urech Bolt Architekten, but with a sweltering 34 degrees in summer, it was unusable. Many post-war buildings cause similar problems and are replaced under buzzwords like densification, efficiency, or economy. But the administration building was lucky. It still looks - or looks again - almost as it did when it was built. It owes this to its municipal protection status, the sensitivity of the planners, and the willingness of BRUGG Immobilien AG as the building owner to put a little more money in its hand.</p>]]>
      </description>
      <content:encoded>
      </content:encoded>
      <enclosure url="https://images.adsttc.com/media/images/64b5/2203/5921/182e/7358/f60f/newsletter/verwaltungsgebaude-brugg-kabelwerke-tschudin-urech-bolt-architekten_1.jpg?1689592371"></enclosure>
    </item>
    <item>
      <title>
        <![CDATA[Biozentrum Research Building University of Basel  / Ilg Santer Architekten]]>
      </title>
      <link>https://www.archdaily.com/969945/biozentrum-research-building-university-of-basel-ilg-santer-architekten</link>
      <pubDate>Mon, 11 Oct 2021 06:00:00 +0000</pubDate>
      <dc:creator>Paula Pintos</dc:creator>
      <category>
        <![CDATA[Educational Architecture]]>
      </category>
      <guid isPermaLink="false">https://www.archdaily.com/969945/biozentrum-research-building-university-of-basel-ilg-santer-architekten</guid>
      <description>
        <![CDATA[<p>The University of Basel's Biozentrum is one of the world's leading institutes for basic molecular and biomedical research and teaching. Located near the Rhine River, the Biozentrum's 72- meter-high tower comprises 19 floors - 16 above ground and 3 below. A floor area of 23,440 square meters houses research facilities, lecture halls, seminar rooms, and scientific equipment for 400 researchers and 900 students. The Biozentrum building by Ilg Santer Architects, Zurich, is the first part of the new campus site where all faculties will be concentrated in one place. </p>]]>
      </description>
      <content:encoded>
      </content:encoded>
      <enclosure url="https://images.adsttc.com/media/images/6163/5b6d/f91c/81c1/b100/00eb/newsletter/Biozentrum_Ilg-Santer_Daisuke-Hirabayashi_WEB_007.jpg?1633901401"></enclosure>
    </item>
    <item>
      <title>
        <![CDATA[TWIST Studentisches Wohnen ETH Zürich / architektick]]>
      </title>
      <link>https://www.archdaily.com/906697/twist-studentisches-wohnen-eth-zurich-architektick</link>
      <pubDate>Fri, 30 Nov 2018 00:00:00 +0000</pubDate>
      <dc:creator>Pilar Caballero</dc:creator>
      <category>
        <![CDATA[Dorms]]>
      </category>
      <guid isPermaLink="false">https://www.archdaily.com/906697/twist-studentisches-wohnen-eth-zurich-architektick</guid>
      <description>
        <![CDATA[<p>Three building volumes smoothly interlock. They create a succession of diverse spatial sequences and form a rhythmic open space that is rich in variety and offers a high-quality place to spend time.</p>]]>
      </description>
      <content:encoded>
      </content:encoded>
      <enclosure url="https://images.adsttc.com/media/images/5bfd/e357/08a5/e522/0900/007e/newsletter/Twist_duerr_SE-3.jpg?1543365448"></enclosure>
    </item>
    <item>
      <title>
        <![CDATA[Country House / E2A]]>
      </title>
      <link>https://www.archdaily.com/632618/country-house-e2a</link>
      <pubDate>Fri, 22 May 2015 02:00:15 +0000</pubDate>
      <dc:creator>Karen Valenzuela</dc:creator>
      <category>
        <![CDATA[Houses]]>
      </category>
      <guid isPermaLink="false">https://www.archdaily.com/632618/country-house-e2a</guid>
      <description>
        <![CDATA[<p>A house with two components of spaces; chambers and voids. The chambers fulfill precisely identified purposes, the voids can anticipate to all the rest yet to come: the chambers are conceived for individual family members, the void to meet and be together.</p>]]>
      </description>
      <content:encoded>
      </content:encoded>
      <enclosure url="https://images.adsttc.com/media/images/555a/93d1/e58e/ce6a/9f00/00ab/large_jpg/portada_Micro-Cosmos_II_522745107_1__DM_Wehrli.jpg?1431999425"></enclosure>
    </item>
    <item>
      <title>
        <![CDATA[Allianz Headquarters / Wiel Arets Architects]]>
      </title>
      <link>https://www.archdaily.com/489836/allianz-headquarters-wiel-arets-architects</link>
      <pubDate>Wed, 26 Mar 2014 00:00:00 +0000</pubDate>
      <dc:creator>Daniel Sánchez</dc:creator>
      <category>
        <![CDATA[Office buildings]]>
      </category>
      <guid isPermaLink="false">https://www.archdaily.com/489836/allianz-headquarters-wiel-arets-architects</guid>
      <description>
        <![CDATA[<p>The Allianz Headquarters is a hybrid-office and the pinnacle of a master planned mixed-use district on the edge of Zürich’s city center. Comprised of a 20-story tower and a 5-story annex, these two components are externally linked by a series of four bridges, and vertically linked by numerous interior voids and staircases; as such, the Allianz Headquarters can be experienced as horizontal and vertical landscape of neighborhoods. Fluidly connected to the city center by a multitude of public transportation options, the building encourages the blossoming of twenty-first century office culture, which demands flexibility in space and its use, via its hyper-hybrid programming that amplifies ‘interiority’. </p> ]]>
      </description>
      <content:encoded>
      </content:encoded>
      <enclosure url="https://images.adsttc.com/media/images/5331/f9f0/c07a/8084/8900/000e/newsletter/1__Allianz_Headquarters_-_%C2%A9Jan_Bitter.jpg?1395784162"></enclosure>
    </item>
    <item>
      <title>
        <![CDATA[In Progress: Allianz Headquarters / Wiel Arets Architects]]>
      </title>
      <link>https://www.archdaily.com/342035/in-progress-allianz-headquarters-wiel-arets-architects-2</link>
      <pubDate>Sat, 09 Mar 2013 01:00:00 +0000</pubDate>
      <dc:creator>Nico Saieh</dc:creator>
      <category>
        <![CDATA[Office buildings]]>
      </category>
      <guid isPermaLink="false">https://www.archdaily.com/342035/in-progress-allianz-headquarters-wiel-arets-architects-2</guid>
      <description>
        <![CDATA[<p><span style="line-height: 1.5em;">The hybrid program occupies two buildings, a high-rise and a five-story building, which are linked by a series of bridges that enable the various offices, employee amenities, retail facilities, restaurants, and cafés of the complex to be both easily accessed and fluidly interrelated.</span><br></p> ]]>
      </description>
      <content:encoded>
      </content:encoded>
      <enclosure url="https://images.adsttc.com/media/images/513a/4349/b3fc/4b9c/ee00/0082/large_jpg/RackMultipart20130308-29360-11egx8k.jpg?1362772806"></enclosure>
    </item>
  </channel>
</rss>
