<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:wfw="http://wellformedweb.org/CommentAPI/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:atom="http://www.w3.org/2005/Atom" xmlns:sy="http://purl.org/rss/1.0/modules/syndication/" xmlns:slash="http://purl.org/rss/1.0/modules/slash/" xmlns:georss="http://www.georss.org/georss" xmlns:webfeeds="http://webfeeds.org/rss/1.0">
  <channel>
    <title>Expert: CEIBE Serveis d´Enginyeria | ArchDaily</title>
    <description>ArchDaily | Broadcasting Architecture Worldwide</description>
    <link>https://www.archdaily.com/</link>
    <lastBuildDate>Fri, 26 Jun 2026 00:00:00 +0000</lastBuildDate>
    <language>en-US</language>
    <atom:link rel="self" type="application/rss+xml" href="https://www.archdaily.com/show.xml"/>
    <sy:updatePeriod>hourly</sy:updatePeriod>
    <sy:updateFrequency>1</sy:updateFrequency>
    <webfeeds:logo>https://assets.adsttc.com/doodles/archdaily-logo-feedly.svg</webfeeds:logo>
    <webfeeds:accentColor>026CB6</webfeeds:accentColor>
    <webfeeds:analytics id="UA-73308-12" engine="GoogleAnalytics"/>
    <item>
      <title>
        <![CDATA[Escuela en San Medir / rdl arquitectos]]>
      </title>
      <link>https://www.archdaily.com/365921/escuela-en-san-medir-rdl-arquitectos</link>
      <pubDate>Mon, 29 Apr 2013 00:00:00 +0000</pubDate>
      <dc:creator>Jonathan Alarcón</dc:creator>
      <category>
        <![CDATA[Schools]]>
      </category>
      <guid isPermaLink="false">https://www.archdaily.com/365921/escuela-en-san-medir-rdl-arquitectos</guid>
      <description>
        <![CDATA[<p>Initially the school was formed by three bodies without connection between them. A main building, ground floor in basement and two upper floors. A second volume, the classroom block, one plant only, also in basement, and a small tier. Only a narrow entrance, from the plaza generated by the Sant Medir’s church’s, permitted all the childhood, access to the school. The proposal includes the demolition of the classrooms block and the tier, the ground’s digging and the construction of a new building that houses the entire expansion program, which gets connected to the existing building at ground floor level. These simplifies the access to the old building with an elevator installation, set-up order in the relationship between the building and it’s perimeter, generates new play, living, and interaction out spaces, and finally creates a new accessible entrance on the backyard street, with much less traffic.</p>]]>
      </description>
      <content:encoded>
      </content:encoded>
      <enclosure url="https://images.adsttc.com/media/images/517d/56e0/b3fc/4ba7/8100/001d/newsletter/2.jpg?1367168728"></enclosure>
    </item>
  </channel>
</rss>
