<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:wfw="http://wellformedweb.org/CommentAPI/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:atom="http://www.w3.org/2005/Atom" xmlns:sy="http://purl.org/rss/1.0/modules/syndication/" xmlns:slash="http://purl.org/rss/1.0/modules/slash/" xmlns:georss="http://www.georss.org/georss" xmlns:webfeeds="http://webfeeds.org/rss/1.0">
  <channel>
    <title>Office: Tekhnê Architectes | ArchDaily</title>
    <description>ArchDaily | Broadcasting Architecture Worldwide</description>
    <link>https://www.archdaily.com/</link>
    <lastBuildDate>Sat, 28 Nov 2026 00:00:00 +0000</lastBuildDate>
    <language>en-US</language>
    <atom:link rel="self" type="application/rss+xml" href="https://www.archdaily.com/show.xml"/>
    <sy:updatePeriod>hourly</sy:updatePeriod>
    <sy:updateFrequency>1</sy:updateFrequency>
    <webfeeds:logo>https://assets.adsttc.com/doodles/archdaily-logo-feedly.svg</webfeeds:logo>
    <webfeeds:accentColor>026CB6</webfeeds:accentColor>
    <webfeeds:analytics id="UA-73308-12" engine="GoogleAnalytics"/>
    <item>
      <title>
        <![CDATA[School in Montrottier / Tekhnê Architectes]]>
      </title>
      <link>https://www.archdaily.com/373884/school-in-montrottier-tekhne-architects</link>
      <pubDate>Mon, 20 May 2013 00:00:00 +0000</pubDate>
      <dc:creator>Jonathan Alarcón</dc:creator>
      <category>
        <![CDATA[Kindergarten]]>
      </category>
      <guid isPermaLink="false">https://www.archdaily.com/373884/school-in-montrottier-tekhne-architects</guid>
      <description>
        <![CDATA[<p>The authorities' bold decision to build a new kindergarten and primary school in the heart of <a href="/tag/montrottier">Montrottier</a> was a result of their desire to give this medieval village a new lease of life, and to recentre its development.</p>]]>
      </description>
      <content:encoded>
      </content:encoded>
      <enclosure url="https://images.adsttc.com/media/images/5194/528e/b3fc/4b37/4100/0170/newsletter/26IMG_24233237.jpg?1368674955"></enclosure>
    </item>
    <item>
      <title>
        <![CDATA[Sunny Gymnasium / Tekhnê Architectes]]>
      </title>
      <link>https://www.archdaily.com/286338/sunny-gymnasium-tekhne-architectes</link>
      <pubDate>Sun, 28 Oct 2012 00:00:00 +0000</pubDate>
      <dc:creator>Jonathan Alarcón</dc:creator>
      <category>
        <![CDATA[gymnasium]]>
      </category>
      <guid isPermaLink="false">https://www.archdaily.com/286338/sunny-gymnasium-tekhne-architectes</guid>
      <description>
        <![CDATA[<p>“Projects grow out of their site” is the credo – or even a doxa – of Christian Charignon, founder of the Tekhnê architectural firm. This is proven by the gymnasium in Saint Martin en Haut in the <a href="/tag/lyon">Lyon</a> area – an imposing box, 45 m long by 25 m wide and 10 m high. The scheme meets the daring challenge of integrating this facility very discreetly into a small rural town in the Monts du Lyonnais hills: how could such a giant be merged into its site? Viewed from above, set into the natural slope, it disappears under its plant-covered roof, leaving views open onto the extensive hill landscape. When viewed from below, one single elevation is visible, entirely in wood and glass, without any monumentality, facing onto the secondary school forecourt. The interior has the same feeling of clarity and comfort. Bathed in abundant filtered daylight, the gymnasium sports hall is immediately striking, with its remarkable roof structure formed by an astonishing timber framework. This architectural treatment introduces an organic dimension into the sports hall’s simple geometry. The first objective was to find the right place for a building of this scale and to make it coexist harmoniously with the surrounding urban fabric of low-rise housing. The competition brief requested the facility to be placed at the top of the site, which is around 7 m higher than the bottom. The designers very rapidly imagined the terrible impact on the landscape of a large mass placed at the crest above the village, and they decided to go against this request by placing the gymnasium at the bottom part of the site. Built into the slope, located at the level where large numbers of schoolchildren circulate, the gymnasium structures a square that it forms with the neighbouring secondary school.</p>]]>
      </description>
      <content:encoded>
      </content:encoded>
      <enclosure url="https://images.adsttc.com/media/images/5089/78cb/28ba/0d75/7100/01cd/newsletter/GymnaseStMartin-Ht005.jpg?1414100176"></enclosure>
    </item>
  </channel>
</rss>
