the world's most visited architecture website
i

Sign up now and start saving and organizing your favorite architecture projects and photos

Sign up now to save and organize your favorite architecture projects

i

Find the most inspiring products for your projects in our Product Catalog.

Find the most inspiring products in our Product Catalog.

i

Get the ArchDaily Chrome Extension and be inspired with every new tab. Install here »

i

All over the world, architects are finding cool ways to re-use run-down old buildings. Click here to see the best in Refurbishment Architecture.

Want to see the coolest refurbishment projects? Click here.

i

Immerse yourself in inspiring buildings with our selection of 360 videos. Click here.

See our immersive, inspiring 360 videos. Click here.

All
Projects
Products
Events
Competitions
BROWSE ALL FROM THIS FIRM HERE

Yuma Heritage Library / Studio Ma

00:00 - 17 September, 2011
Yuma Heritage Library / Studio Ma, © Bill Timmerman
© Bill Timmerman

© Bill Timmerman © Bill Timmerman © Bill Timmerman © Bill Timmerman + 7

  • Architects

  • Location

    350 South 3rd Avenue, Yuma, AZ 85364, USA
  • Architect

    Studio Ma, Inc.
  • Design Team

    Christiana Moss, Dan Hoffman, Christopher Alt, Tim Keil, Robert Des Rosiers, Brad Pfahler, Malene Valberg, Stinne Storm
  • Program Manager

    Pinnacle One
  • Mep Engineer

    Kunka Engineering
  • Structural Engineer

    Rudow + Berry
  • Electrical Engineer

    Woodward Engineering
  • Lighting Consultant

    Roger Smith Lighting Design
  • Project Cost

    $3.5M
  • Client

    Yuma County Free Library District
  • Contractor

    Brignall Construction
  • Library Consultant

    Michaels Associates Design Consultants
  • Area

    21000.0 ft2
  • Project Year

    2008
  • Photographs

GEORGE / Studio Ma

00:00 - 14 September, 2011
GEORGE / Studio Ma, © Bill Timmerman Photography
© Bill Timmerman Photography

© Bill Timmerman Photography © Bill Timmerman Photography © Bill Timmerman Photography © Bill Timmerman Photography + 18

  • Architects

  • Location

    Phoenix, Arizona
  • Design Team

    Christiana Moss, Dan Hoffman, Christopher Alt, Robert Des Rosiers, Brad Pfahler
  • Civil Engineer

    Erie & Associates
  • Structural Engineer

    Rudow + Berry
  • Mechanical Engineer

    Associated Mechanical Engineers
  • Electrical Engineer

    Woodward Engineering
  • Landscape Architect

    Levinson Studio
  • Soil Consultant

    Speedie & Associates
  • Lighting Consultant

    Roger Smith Lighting Design
  • Contractor

    Wespac Construction
  • Project Cost

    $3.5M
  • Client

    12th & Missouri, LLC
  • Area

    19200.0 ft2
  • Project Year

    2008
  • Photographs

PRD 845 / Studio Ma

00:00 - 12 September, 2011
PRD 845 / Studio Ma, © Michael Weschler Photography
© Michael Weschler Photography

© Michael Weschler Photography © Michael Weschler Photography © Michael Weschler Photography © Michael Weschler Photography + 19

  • Architects

  • Location

    Phoenix, Arizona
  • Design Team

    Christiana Moss, Dan Hoffman, Christopher Alt, Robert Des Rosiers, Jonah Busick, Brad Pfahler
  • Civil Engineer

    Evans, Kuhn & Associates
  • Structural Engineer

    Rudow + Berry
  • Soil Consultant

    Foree & Vann
  • Mechanical Engineer

    Associated Mechanical Engineers
  • Electrical Engineer

    Woodward Engineering
  • Landscape Architect

    Levinson Studio
  • Project Cost

    $3.5M
  • Contractor

    UrbanEdge Builders
  • Client

    Greenroof Development Company LLC
  • Area

    24000.0 ft2
  • Project Year

    2008
  • Photographs