<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:wfw="http://wellformedweb.org/CommentAPI/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:atom="http://www.w3.org/2005/Atom" xmlns:sy="http://purl.org/rss/1.0/modules/syndication/" xmlns:slash="http://purl.org/rss/1.0/modules/slash/" xmlns:georss="http://www.georss.org/georss" xmlns:webfeeds="http://webfeeds.org/rss/1.0">
  <channel>
    <title>Office: Ronald Lu &amp; Partners | ArchDaily</title>
    <description>ArchDaily | Broadcasting Architecture Worldwide</description>
    <link>https://www.archdaily.com/</link>
    <lastBuildDate>Thu, 19 Nov 2026 00:00:00 +0000</lastBuildDate>
    <language>en-US</language>
    <atom:link rel="self" type="application/rss+xml" href="https://www.archdaily.com/show.xml"/>
    <sy:updatePeriod>hourly</sy:updatePeriod>
    <sy:updateFrequency>1</sy:updateFrequency>
    <webfeeds:logo>https://assets.adsttc.com/doodles/archdaily-logo-feedly.svg</webfeeds:logo>
    <webfeeds:accentColor>026CB6</webfeeds:accentColor>
    <webfeeds:analytics id="UA-73308-12" engine="GoogleAnalytics"/>
    <item>
      <title>
        <![CDATA[Integral Eco-Industrial Campus / Ronald Lu & Partners]]>
      </title>
      <link>https://www.archdaily.com/941325/integral-ronald-lu-and-partners</link>
      <pubDate>Fri, 12 Jun 2020 23:00:00 +0000</pubDate>
      <dc:creator>罗靖琳 - Jinglin Luo</dc:creator>
      <category>
        <![CDATA[Industrial Architecture]]>
      </category>
      <guid isPermaLink="false">https://www.archdaily.com/941325/integral-ronald-lu-and-partners</guid>
      <description>
        <![CDATA[<p><strong>Mission<br></strong>Integral is located in the Jiumeiqiao District of <a href="/tag/guilin">Guilin</a> in Guangxi Province. The total area of the first and second phases of the project stretch over a 511,800 square-metre site. The first phase was completed in 2019, and the entire project is expected to be completed by the end of 2020. The development of Integral has been driven by Esquel, a leading textile and apparel manufacturer. Their vision was to change the traditional image of textile manufacturing being a “low-tech” processing industry by integrating conservation elements with the concept of “Industry 4.0” in a new, state-of-the-art specialty spinning and garment manufacturing plant located in a scenic natural area: Guilin, China. The facility is more than a manufacturing plant, it is an industrial eco-tourism park which embraces the fundamental concepts of Buddhism and which has sustainability elements woven into every aspect of its design.</p>]]>
      </description>
      <content:encoded>
      </content:encoded>
      <enclosure url="https://images.adsttc.com/media/images/5ee8/8a93/b357/6520/0900/0254/newsletter/To_replace_no.2.jpg?1592298106"></enclosure>
    </item>
    <item>
      <title>
        <![CDATA[Shanghai Xujiahui Centre, Lot I & II / Ronald Lu & Partners]]>
      </title>
      <link>https://www.archdaily.com/937874/shanghai-xujiahui-centre-lot-i-and-ii-ronald-lu-and-partners</link>
      <pubDate>Sat, 25 Apr 2020 21:00:00 +0000</pubDate>
      <dc:creator>Collin Chen</dc:creator>
      <category>
        <![CDATA[Commercial Architecture]]>
      </category>
      <guid isPermaLink="false">https://www.archdaily.com/937874/shanghai-xujiahui-centre-lot-i-and-ii-ronald-lu-and-partners</guid>
      <description>
        <![CDATA[<p>Located at the northwest corner of <a href="/tag/shanghai">Shanghai</a>’s Xuhui district, a prominent cultural and commercial destination, Xujiahui Centre is one of the most prestigious projects Shanghai has seen in recent times. The project comprises four comprehensive developments with a total gross floor area at 584,000 sq.m.. The project’s“Plot One”was nominated to this award entry, acting as an introduction to this high-profile project. Plot One has a gross floor area of around 30,000 sq.m. and the project’s strategic plan and design envisions commercial offices on top of a two-storey podium containing a shopping mall.</p>]]>
      </description>
      <content:encoded>
      </content:encoded>
      <enclosure url="https://images.adsttc.com/media/images/5e9a/9ef2/b357/653c/b100/0161/newsletter/Lot1_002_博锐影像.jpg?1587191524"></enclosure>
    </item>
    <item>
      <title>
        <![CDATA[K11 MUSEA  / KPF + Ronald Lu & Partners]]>
      </title>
      <link>https://www.archdaily.com/927244/k11-musea-hong-kong-kpf-plus-rlp</link>
      <pubDate>Mon, 28 Oct 2019 20:00:00 +0000</pubDate>
      <dc:creator>Collin Chen</dc:creator>
      <category>
        <![CDATA[Retail]]>
      </category>
      <guid isPermaLink="false">https://www.archdaily.com/927244/k11-musea-hong-kong-kpf-plus-rlp</guid>
      <description>
        <![CDATA[<p>K11 MUSEA is the world’s first cultural-retail destination, and is situated at the heart of art and design district Victoria Dockside, <a href="/tag/hong-kong">Hong Kong</a>, to enrich the cultural and leisure offerings along the iconic harbourfront. Opened in August 2019, K11 MUSEA is a conceived as a <em>Silicon Valley of Culture</em>, where cross-discipline practices in architecture, art, craft, culture, design, gastronomy and sustainability worked in tandem. And to achieve this ambitious goal, K11 Group founder Adrian Cheng has collaborated with and enlisted the help of 100 architects, designers and artists including Kohn Pedersen Fox, James Corner Field Operations, Ronald Lu &amp; Partners, Leigh &amp; Orange, LAAB Architects, AB Concept, Monstrum and PLandscape.</p>]]>
      </description>
      <content:encoded>
      </content:encoded>
      <enclosure url="https://images.adsttc.com/media/images/5db5/82ee/3312/fd22/3f00/08bf/newsletter/K11_MUSEA_Seafront_(1)_(1).jpg?1572176611"></enclosure>
    </item>
    <item>
      <title>
        <![CDATA[Xiqu Centre / Revery Architecture + Ronald Lu & Partners]]>
      </title>
      <link>https://www.archdaily.com/912940/xiqu-centre-revery-architecture</link>
      <pubDate>Thu, 14 Mar 2019 23:00:00 +0000</pubDate>
      <dc:creator>Andreas Luco</dc:creator>
      <category>
        <![CDATA[opera house]]>
      </category>
      <guid isPermaLink="false">https://www.archdaily.com/912940/xiqu-centre-revery-architecture</guid>
      <description>
        <![CDATA[<p>Xiqu Centre is Hong Kong’s prestigious new home for traditional Chinese opera. With its dramatic curvilinear façade and reinterpretation of the customary Chinese Moon Gate motif, Xiqu Centre creates a stunning landmark entrance as the gateway to the West Kowloon Cultural District (WKCD), the city’s new precinct for arts and culture. Conceived as a cultural sanctuary; blending theatre, art, and a dynamic public realm, this iconic 7-storey performance venue is dedicated to promoting the rich heritage of Xiqu—Chinese opera, the primary genre of indigenous Chinese theatre—and to the production, education and research of this unique and traditional art form.</p>]]>
      </description>
      <content:encoded>
      </content:encoded>
      <enclosure url="https://images.adsttc.com/media/images/5c85/c946/284d/d1d6/2c00/0243/newsletter/FEATURE-_44Xiqu_Plaza_(1).jpg?1552271667"></enclosure>
    </item>
    <item>
      <title>
        <![CDATA[Xiqu Centre / Bing Thom Architects + Ronald Lu & Partners]]>
      </title>
      <link>https://www.archdaily.com/790232/new-images-video-for-bing-thom-architects-xiqu-centre-revealed</link>
      <pubDate>Fri, 24 Jun 2016 16:00:00 +0000</pubDate>
      <dc:creator>Patrick Lynch</dc:creator>
      <guid isPermaLink="false">https://www.archdaily.com/790232/new-images-video-for-bing-thom-architects-xiqu-centre-revealed</guid>
      <description>
        <![CDATA[<p dir="ltr"><a href="http://www.archdaily.com/tag/bing-thom-architects" target="_blank">Bing Thom Architects</a> have released new images for <a href="/tag/hong-kong">Hong Kong</a>’s <a href="http://www.archdaily.com/305010/xiqu-center-winning-design-bing-thom-architects-ronald-lu-partners" target="_blank">Xiqu Centre</a>, designed in collaboration with <a href="http://www.archdaily.com/tag/ronald-lu-and-partners/" target="_blank">Ronald Lu &amp; Partners</a>. Currently under construction, the building is scheduled for completion in 2017, becoming the first venue to open within the new <a href="http://www.archdaily.com/tag/west-kowloon-cultural-district-authority" target="_blank">West Kowloon Cultural District</a>. The Xiqu Centre will serve as the home of the Chinese Opera, as well as play host to an array of cultural events.</p>]]>
      </description>
      <content:encoded>
      </content:encoded>
      <enclosure url="https://images.adsttc.com/media/images/576d/85fc/e58e/ce0d/5400/019b/newsletter/Xiqu_2016_01.jpg?1466795507"></enclosure>
    </item>
    <item>
      <title>
        <![CDATA[SK Yee Healthy Life Centre / Ronald Lu & Partners]]>
      </title>
      <link>https://www.archdaily.com/590542/sk-yee-healthy-life-centre-ronald-lu-and-partners</link>
      <pubDate>Mon, 26 Jan 2015 01:00:00 +0000</pubDate>
      <dc:creator>Daniel Sánchez</dc:creator>
      <category>
        <![CDATA[healthcare center]]>
      </category>
      <guid isPermaLink="false">https://www.archdaily.com/590542/sk-yee-healthy-life-centre-ronald-lu-and-partners</guid>
      <description>
        <![CDATA[<p>The SK Yee Healthy Life Centre is a modest yet meaningful project. Ronald Lu &amp; Partners (RLP) completed the architectural design, including the interior fit-out, for a rooftop addition with the construction of a lightweight 380 sq.m. structure.</p>]]>
      </description>
      <content:encoded>
      </content:encoded>
      <enclosure url="https://images.adsttc.com/media/images/54c0/6f2d/e58e/ceef/7000/02e1/newsletter/portada_1_High_green_ratio_of_57_percent.jpg?1421897501"></enclosure>
    </item>
    <item>
      <title>
        <![CDATA[Kwun Tong swimming pools and playgrounds / Ronald Lu & Partners]]>
      </title>
      <link>https://www.archdaily.com/516547/kwun-tong-swimming-pools-and-playgrounds-ronald-lu-and-partners</link>
      <pubDate>Wed, 18 Jun 2014 01:00:00 +0000</pubDate>
      <dc:creator>Daniel Sánchez</dc:creator>
      <category>
        <![CDATA[swimming pool]]>
      </category>
      <guid isPermaLink="false">https://www.archdaily.com/516547/kwun-tong-swimming-pools-and-playgrounds-ronald-lu-and-partners</guid>
      <description>
        <![CDATA[<p>The project, which occupies an area of 39,000 square metres, will be delivered in two stages. The first stage primarily covers the construction of the new complex. It includes a 50-metre x 25-metre indoor heated main pool, a 25-metre x 30-metre indoor heated training pool, an indoor spectator stand with a seating capacity for 1,500 spectators, a 50-metre x 21-metre outdoor secondary pool, two 25-metre x 12.5-metre outdoor teaching pools, a sunbathing area and ancillary facilities.The second stage, to be commenced upon completion of the new swimming pool complex, involves the demolition of the existing pool and construction of a recreation ground.</p>]]>
      </description>
      <content:encoded>
      </content:encoded>
      <enclosure url="https://images.adsttc.com/media/images/539e/10a8/c07a/803d/f400/0881/newsletter/00portada.jpg?1402867871"></enclosure>
    </item>
    <item>
      <title>
        <![CDATA[Siu Sai Wan Complex / Ronald Lu & Partners]]>
      </title>
      <link>https://www.archdaily.com/282891/siu-sai-wan-complex-ronald-lu-and-partners</link>
      <pubDate>Sun, 21 Oct 2012 00:00:00 +0000</pubDate>
      <dc:creator>Daniel Sánchez</dc:creator>
      <category>
        <![CDATA[Mixed Use Architecture]]>
      </category>
      <guid isPermaLink="false">https://www.archdaily.com/282891/siu-sai-wan-complex-ronald-lu-and-partners</guid>
      <description>
        <![CDATA[<p>Comprising a 1000-seat multi-purpose arena, two indoor swimming pools, a library, a table tennis centre, a children’s play room, two combinable activities rooms and a 450-seat community hall, Siu Sai Wan Complex provides leisure and recreational facilities within an iconic green building envelope for residents in the Eastern District of Hong Kong Island.</p>]]>
      </description>
      <content:encoded>
      </content:encoded>
      <enclosure url="https://images.adsttc.com/media/images/5078/d453/28ba/0d16/3a00/0086/newsletter/SSW_01.jpg?1375412700"></enclosure>
    </item>
    <item>
      <title>
        <![CDATA[ZCB Zero Carbon Building / Ronald Lu & Partners]]>
      </title>
      <link>https://www.archdaily.com/282880/zcb-zero-carbon-building-ronald-lu-and-partners</link>
      <pubDate>Thu, 18 Oct 2012 00:00:00 +0000</pubDate>
      <dc:creator>Daniel Sánchez</dc:creator>
      <category>
        <![CDATA[Cultural Architecture]]>
      </category>
      <guid isPermaLink="false">https://www.archdaily.com/282880/zcb-zero-carbon-building-ronald-lu-and-partners</guid>
      <description>
        <![CDATA[<p>ZCB is the first zero carbon building in Hong Kong. Energy hierarchy with its priority on energy demand control is adopted. Passive design with climate-responsive built form, orientation, layout and envelope enhance natural ventilation, daylighting and solar shading. The spacious entrance hallway is orientated and fully opened to the prevailing summer breeze, and provides a comfortable setting for gathering and temporary exhibition without the use of air-conditioning. An ultra-low OTTV of 11 W/m2 is achieved mainly due to optimized window-to-wall ratio, deep overhang over the south facade, external shading fins, minimized east and west facades / windows, high performance glazing system, and shaded and insulated roof. These passive design measures are expected to reduce energy consumption by 20% as compared to the current building industry benchmark. The use of highly energy-efficient active systems like high-volume-low-speed fans, high temperature cooling system, coupling with smart control can further reduce the potential energy demand by 25%. The ZCB targets “Energy Plus” which goes beyond conventional scope of carbon neutrality by producing more energy than its own needs over an annual basis, to offset the embodied carbon of its construction process and major structural materials. On-site renewable energy generation by bio-diesel tri-generation and state-of-the-art photovoltaic (PV) technologies is adopted.</p>]]>
      </description>
      <content:encoded>
      </content:encoded>
      <enclosure url="https://images.adsttc.com/media/images/5078/dce2/28ba/0d16/4000/0085/newsletter/ZCB_01_and_One_Planet_Living_Loop.jpg?1375412814"></enclosure>
    </item>
  </channel>
</rss>
