<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:wfw="http://wellformedweb.org/CommentAPI/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:atom="http://www.w3.org/2005/Atom" xmlns:sy="http://purl.org/rss/1.0/modules/syndication/" xmlns:slash="http://purl.org/rss/1.0/modules/slash/" xmlns:georss="http://www.georss.org/georss" xmlns:webfeeds="http://webfeeds.org/rss/1.0">
  <channel>
    <title>Office: China Northeast Architectural Design and Research Institute | ArchDaily</title>
    <description>ArchDaily | Broadcasting Architecture Worldwide</description>
    <link>https://www.archdaily.com/</link>
    <lastBuildDate>Tue, 13 Oct 2026 00:00:00 +0000</lastBuildDate>
    <language>en-US</language>
    <atom:link rel="self" type="application/rss+xml" href="https://www.archdaily.com/show.xml"/>
    <sy:updatePeriod>hourly</sy:updatePeriod>
    <sy:updateFrequency>1</sy:updateFrequency>
    <webfeeds:logo>https://assets.adsttc.com/doodles/archdaily-logo-feedly.svg</webfeeds:logo>
    <webfeeds:accentColor>026CB6</webfeeds:accentColor>
    <webfeeds:analytics id="UA-73308-12" engine="GoogleAnalytics"/>
    <item>
      <title>
        <![CDATA[Shenyang Taoxian International Airport Terminal 3 / CNADRI]]>
      </title>
      <link>https://www.archdaily.com/788871/terminal-3-of-shenyang-taoxian-international-airport-china-northeast-architectural-design-and-research-institute</link>
      <pubDate>Thu, 11 Aug 2016 19:00:00 +0000</pubDate>
      <dc:creator>周咪咪</dc:creator>
      <category>
        <![CDATA[Airport]]>
      </category>
      <guid isPermaLink="false">https://www.archdaily.com/788871/terminal-3-of-shenyang-taoxian-international-airport-china-northeast-architectural-design-and-research-institute</guid>
      <description>
        <![CDATA[<p>The year of completion for Terminal 3 was 2013. On the basis of T1 and T2 with existing 7.5 MAP, T3 was supposed to meet the 17.5million passenger demand in 2020 with 6,430 passengers in peak hour (5,130 domestic passengers and 1,300 international passengers). Combined together, T1, T2 and T3 can meet the demand of 25 million passengers in 2020.</p>]]>
      </description>
      <content:encoded>
      </content:encoded>
      <enclosure url="https://images.adsttc.com/media/images/5753/7e2d/e58e/ce5e/7400/02a5/newsletter/4.jpg?1465089560"></enclosure>
    </item>
    <item>
      <title>
        <![CDATA[Zhengzhou Xinzheng International Airport Terminal 2 / CNADRI]]>
      </title>
      <link>https://www.archdaily.com/786356/zhengzhou-xinzheng-international-airport-terminal-2-cnadri</link>
      <pubDate>Wed, 27 Apr 2016 17:00:00 +0000</pubDate>
      <dc:creator>HE Shen 何珅</dc:creator>
      <category>
        <![CDATA[Airport]]>
      </category>
      <guid isPermaLink="false">https://www.archdaily.com/786356/zhengzhou-xinzheng-international-airport-terminal-2-cnadri</guid>
      <description>
        <![CDATA[<p>Terminal 2 is in the east of the terminal zone of <a href="/tag/zhengzhou">Zhengzhou</a> Xinzheng International Airport, which is to the northeast of Terminal 1, and 270m away from the closest point of Terminal 1. It is at the end of Yinbing Road, and perpendicular to the airport access entry. A plaza is enclosed by Terminal 2, Terminal 1 and the future Terminal 3. The X-layout of T2 includes the main building, the southeast, northeast, southwest and northwest concourses, as well as the internal connection concouses. It is a four floors building for both domestic and international passengers.</p>]]>
      </description>
      <content:encoded>
      </content:encoded>
      <enclosure url="https://images.adsttc.com/media/images/5720/8a12/e58e/ce06/2e00/0003/newsletter/_72A0807.jpg?1461750286"></enclosure>
    </item>
  </channel>
</rss>
